Compaq ProLiant 8500 Compaq ProLiant 8500 Setup and Installation Guide - Page 161

Power On/Standby switch, Processor Power Module

Page 161 highlights

8 Compaq ProLiant 8500 Servers Setup and Installation Guide overview system interconnect 3-4 Windows NT 4-29 P panel opening 3-7 top access 3-6 parallel interface control 1-13 port connector 2-26 partition, system 1-11 parts proper handling B-1 storing B-1 transporting B-1 PCI Hot Plug buses, identified 4-34 expansion slots, accessing 3-6 with Microsoft Windows NT 4-30 with Novell NetWare 4-31 with SCO software 4-33 PCI, non-hot plug 4-25 port addresses 1-10 POST messages 1-13 power cord grounding plug 3-2 cord retention clip 2-27 disconnecting cords 3-2 margin 1-8 modules, accessing 3-10 removing 3-2 standby 3-2 strips 2-3, 2-4 supplies, advanced features 1-7 supplies, balancing 2-3 supplies, hot plug 4-2 supplies, indicators 3-3, 4-4 supplies, LED states 8-5 supplies, options 2-7 supplies, supported 1-7 supply indicators, green 3-3 power supply indicators, green/amber alternating 3-3 supply indicators, normal operation 3-3 supply, indicators 3-3 power cord set agency approval C-1 applicance coupler specifications C-1 cable length C-1 cable specifications C-3 country-specific requirements C-2 current capacity C-1 obtaining additional information C-1 requirements C-1 voltage rating C-1 wall plug specifications C-3 Power Down Manager 2-29 Power Down Utility 1-7 Power On/Standby switch 3-2 Power Supply Utility 1-7 power, supplies, numbering 3-4 powering down LEDs 2-29 procedure 2-29 powering up 2-28 Power-On Self-Test See POST Processor and Memory module illustrated 1-2 opening 3-9 removing 3-10 Processor Power Module illustrated 4-5 installing 4-5, 4-7, 4-10 sockets 4-6 Processor Serial Number 3-11 processors accessing 3-10 bus/core ratio switch, accessing 3-6 features 1-3 installation overview 4-7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165

8
Compaq ProLiant 8500 Servers Setup and Installation Guide
overview
system interconnect
3-4
Windows NT
4-29
P
panel
opening
3-7
top access
3-6
parallel
interface control
1-13
port connector
2-26
partition, system
1-11
parts
proper handling
B-1
storing
B-1
transporting
B-1
PCI Hot Plug
buses, identified
4-34
expansion slots, accessing
3-6
with Microsoft Windows
NT
4-30
with Novell NetWare
4-31
with SCO software
4-33
PCI, non-hot plug
4-25
port addresses
1-10
POST messages
1-13
power
cord grounding plug
3-2
cord retention clip
2-27
disconnecting cords
3-2
margin
1-8
modules, accessing
3-10
removing
3-2
standby
3-2
strips
2-3, 2-4
supplies, advanced
features
1-7
supplies, balancing
2-3
supplies, hot plug
4-2
supplies, indicators
3-3, 4-4
supplies, LED states
8-5
supplies, options
2-7
supplies, supported
1-7
supply indicators, green
3-3
power
supply indicators, green/amber
alternating
3-3
supply indicators, normal
operation
3-3
supply, indicators
3-3
power cord set
agency approval
C-1
applicance coupler
specifications
C-1
cable length
C-1
cable specifications
C-3
country-specific
requirements
C-2
current capacity
C-1
obtaining additional
information
C-1
requirements
C-1
voltage rating
C-1
wall plug specifications
C-3
Power Down Manager
2-29
Power Down Utility
1-7
Power On/Standby switch
3-2
Power Supply Utility
1-7
power, supplies, numbering
3-4
powering down
LEDs
2-29
procedure
2-29
powering up
2-28
Power-On Self-Test
See
POST
Processor and Memory module
illustrated
1-2
opening
3-9
removing
3-10
Processor Power Module
illustrated
4-5
installing
4-5, 4-7, 4-10
sockets
4-6
Processor Serial Number
3-11
processors
accessing
3-10
bus/core ratio switch,
accessing
3-6
features
1-3
installation overview
4-7