Compaq ProLiant 8500 Compaq ProLiant 8500 Setup and Installation Guide - Page 46
Installing the Server into the Rack, IMPORTANT, WARNING
View all Compaq ProLiant 8500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 46 highlights
2-20 Compaq ProLiant 8500 Servers Setup and Installation Guide 3. Secure the back of each mounting bracket on the outside of the back of the rack with one cage nut and one M6 x 1.0-12L Phillips screw in the bottom hole of the bracket as shown in the following figure. IMPORTANT: Make sure that the mounting bracket is level from front to back. Use one screw only in the bottom hole of the bracket; otherwise, proper alignment is impossible. Figure 2-14. Attaching the slide rail assembly to the back of the rack Installing the Server into the Rack WARNING: To reduce the risk of personal injury or damage to the equipment: s Observe local Occupational Safety requirements and guidelines for heavy equipment handling. s Obtain adequate assistance to lift and stabilize the chassis during installation or removal. s Remove all pluggable power supplies and modules to reduce the weight of the chassis. s The unit will be unstable when not mated with the rails. IMPORTANT: To reduce the weight of the system, Compaq recommends that all power supplies, Processor and Memory Module, and Media Module should be removed from the system before loading in onto the rails