Compaq ProLiant 8500 Compaq ProLiant 8500 Setup and Installation Guide - Page 72
Power Supply Indicators in Server Operation.
View all Compaq ProLiant 8500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 72 highlights
4-4 Compaq ProLiant 8500 Servers Setup and Installation Guide 2 1 Figure 4-3. Securing the hot-plug power supply 8. Plug in the power cord. If desired, use the plastic retainer to secure the AC cord to the plastic loop provided on the power supply. Leave an 8-inch service loop for the plug. This will prevent the plug from becoming disengaged accidentally. Figure 4-4. Securing the AC cord to the power supply 9. Verify the AC status LED is green. If installation is performed with the system power on, the power supply indicators should activate immediately. 10. For a detailed description of the power supply indicators; see Table 3-1, "Power Supply Indicators" in Chapter 3, "Server Operation."
4-4
Compaq ProLiant 8500 Servers Setup and Installation Guide
1
2
Figure 4-3.
Securing the hot-plug power supply
8.
Plug in the power cord. If desired, use the plastic retainer to secure the
AC cord to the plastic loop provided on the power supply. Leave an
8-inch service loop for the plug. This will prevent the plug from
becoming disengaged accidentally.
Figure 4-4.
Securing the AC cord to the power supply
9.
Verify the AC status LED is green. If installation is performed with the
system power on, the power supply indicators should activate
immediately.
10.
For a detailed description of the power supply indicators; see Table 3-1,
“Power Supply Indicators” in Chapter 3, “Server Operation.”