HP 418800-B21 HP StorageWorks Replication Solutions Manager 4.0.1 user guide ( - Page 179

Scheduling job events

Page 179 highlights

2. Select an appropriate resource type (if appropriate) and click OK. A list of available resources appears. In some cases, you can filter the list or narrow the choices. 3. Select a resource (or several if appropriate) to include in the argument and click OK. The selected resources are added to the command argument and the Argument Editor window closes. 4. In the Editing Task window, select another argument, or click OK to close the window. IMPORTANT: Selected values appear in the job editor but are not saved until the job is saved. Scheduling job events Creating scheduled job events You can create a scheduled job event that runs a job at a specified interval (frequency) and start time. You can create multiple scheduled job events for a single job. For example, create a scheduled job event to run a job every day at 5:00 PM and create another event to run the job once a week (every 7 days) at 12:00AM. See also Editing scheduled job events. Procedure 1. In the navigation pane, select Jobs to display the Jobs window in the content pane. 2. Click the Schedule tab. The Schedule tab shows the list of scheduled job events. 3. Select Actions > Schedule Job. The Schedule a Job wizard opens, displaying the Select a Job page. Follow the instructions in the wizard. Editing scheduled job events You can edit a scheduled job event to change the start time and run interval (frequency). You can also update the saved logon credentials. See also creating scheduled job events. Considerations • You cannot save a scheduled job event without entering security credentials. See security credentials for the server. Procedure 1. In the navigation pane, select Jobs to display the Jobs window in the content pane. 2. Click the Schedule tab. The Schedule tab shows the list of scheduled job events. 3. Select the scheduled job event to edit. 4. Select Actions > Edit Schedule. The Edit Job Schedule window opens. 5. On the Credentials tab, enter the logon credentials that are required for the job to access the replication manager server. 6. On the Interval tab, you can change the start time and interval (frequency). See choosing a run interval. See also troubleshooting, Scheduled job event run times are wrong (AM/PM). 7. Click OK. The scheduled event is updated. Enabling and disabling scheduled job events HP StorageWorks Replication Solutions Manager 4.0.1 179

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332
  • 333
  • 334
  • 335
  • 336
  • 337
  • 338
  • 339
  • 340
  • 341
  • 342
  • 343
  • 344
  • 345
  • 346
  • 347
  • 348
  • 349
  • 350
  • 351
  • 352
  • 353
  • 354
  • 355
  • 356
  • 357
  • 358
  • 359
  • 360
  • 361
  • 362
  • 363
  • 364
  • 365
  • 366
  • 367
  • 368
  • 369
  • 370
  • 371
  • 372
  • 373
  • 374
  • 375
  • 376
  • 377
  • 378
  • 379
  • 380
  • 381
  • 382
  • 383
  • 384
  • 385
  • 386
  • 387
  • 388
  • 389
  • 390
  • 391
  • 392
  • 393
  • 394
  • 395
  • 396
  • 397
  • 398
  • 399
  • 400
  • 401
  • 402
  • 403
  • 404
  • 405
  • 406
  • 407
  • 408
  • 409
  • 410
  • 411
  • 412
  • 413
  • 414
  • 415
  • 416
  • 417
  • 418
  • 419
  • 420
  • 421
  • 422
  • 423
  • 424
  • 425
  • 426
  • 427
  • 428
  • 429
  • 430
  • 431
  • 432
  • 433
  • 434
  • 435
  • 436
  • 437
  • 438
  • 439
  • 440
  • 441
  • 442
  • 443
  • 444
  • 445
  • 446
  • 447
  • 448
  • 449
  • 450
  • 451
  • 452
  • 453
  • 454
  • 455
  • 456
  • 457
  • 458
  • 459
  • 460
  • 461
  • 462

2.
Select an appropriate resource type (if appropriate) and click
OK
. A list of available resources
appears. In some cases, you can
lter the list or narrow the choices.
3.
Select a resource (or several if appropriate) to include in the argument and click
OK
. The selected
resources are added to the command argument and the Argument Editor window closes.
4.
In the Editing Task window, select another argument, or click
OK
to close the window.
IMPORTANT:
Selected values appear in the job editor but are not saved until the job is saved.
Scheduling job events
Creating scheduled job events
You can create a
scheduled job event
that runs a job at a speci
ed interval (frequency) and start time.
You can create multiple scheduled job events for a single job. For example, create a scheduled job
event to run a job every day at 5:00 PM and create another event to run the job once a week (every
7 days) at 12:00AM.
See also
Editing scheduled job events
.
Procedure
1.
In the navigation pane, select
Jobs
to display the Jobs window in the content pane.
2.
Click the
Schedule
tab. The Schedule tab shows the list of scheduled job events.
3.
Select
Actions > Schedule Job
. The Schedule a Job wizard opens, displaying the Select a Job
page. Follow the instructions in the wizard.
Editing scheduled job events
You can edit a
scheduled job event
to change the start time and run interval (frequency). You can also
update the saved logon credentials. See also
creating scheduled job events
.
Considerations
You cannot save a scheduled job event without entering security credentials.
See
security credentials for the server
.
Procedure
1.
In the navigation pane, select
Jobs
to display the Jobs window in the content pane.
2.
Click the
Schedule
tab. The Schedule tab shows the list of scheduled job events.
3.
Select the scheduled job event to edit.
4.
Select
Actions > Edit Schedule
. The Edit Job Schedule window opens.
5.
On the Credentials tab, enter the logon credentials that are required for the job to access the
replication manager server.
6.
On the Interval tab, you can change the start time and interval
(frequency).
See
choosing a run interval
.
See also troubleshooting,
Scheduled job event run times are wrong (AM/PM)
.
7.
Click
OK
. The scheduled event is updated.
Enabling and disabling scheduled job events
HP StorageWorks Replication Solutions Manager 4.0.1
179