Epson 2070 Service Manual - Page 110
Disassembly and Assembly of CSF Bin 2, Removing 1 E-ring and 2 CTBS Screws
UPC - 010343812277
View all Epson 2070 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 110 highlights
Disassembly and Assembly 3.4 Disassembly and Assembly of CSF Bin 2 3.4.1 Disassembling the Right Side Block LQ-2070 Service Manual E- ring CTPB Screw (3x8) Right CSF Frame Figure 3-50 Removing 1 E-ring and 2 CTBS Screws 1. Remove the gear train cover by releasing the 4 clips shown in the following figure. 2. Remove the following 5 gears and 1 spring from the right CSF frame. Assembly Note Pay attention how the 5 gears are engaged. Refer to the following figure. Left CSF Roller Cover Right CSF Roller Cover Figure 3-51 Removing the CSF Roller Cover 3-32 Rev.A
3.4 Disassembly and Assembly of CSF Bin 2
3.4.1 Disassembling the Right Side Block
1.
Remove the gear train cover by releasing the 4 clips shown in the following figure.
2.
Remove the following 5 gears and 1 spring from the right CSF frame.
Pay attention how the 5 gears are engaged. Refer to the following figure.
E- ring
CTPB Screw (3x8)
Right CSF Frame
Figure 3-50 Removing 1 E-ring and 2 CTBS Screws
Right
CSF Roller Cover
Left CSF Roller Cover
Figure 3-51 Removing the CSF Roller Cover
Disassembly and Assembly
LQ-2070 Service Manual
3-32
Rev.A