Table 5-8, Site Inspection Checklist, Please check either Yes or No. If No, include comment or date

Page 178 highlights

Site Preparation Pre-Installation Survey NOTE To ensure compliance with item 10 of Table 5-8, provide a copy of Appendix D to the customer to use a worksheet to identify required names and addresses for the LAN. Table 5-8 Site Inspection Checklist Please check either Yes or No. If No, include comment or date Comment or Date Computer room No. Area or condition Yes No 1. Is there a completed floor plan? 2. Is there adequate space for maintenance needs? Front 42 in (106 cm) min., 48 in (121 cm) recommended. Rear 32 in (81 cm) min., 36 in (91cm) recommended 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? What is the floor to ceiling height? [7.5 ft (228 cm) minimum] 6. Is the raised floor adequate for equipment loading? 7. Are there channels or cutouts for cable routing? 8. Is there a remote console telephone line available with an RJ11 jack? 9. Is a telephone line available? 9a. Is the customer aware of the iCOD email requirements? Each bootable partition requires a connection to the internet to send email to notify Hewlett-Packard that the customer has allocated additional CPUs beyond the amount initially purchased. Each bootable partition must be configured to perform this operation. For more details, go to http://superdome.hp.com and click on the iCOD link. 10. Are customer supplied peripheral and LAN cables available and of the proper type? 166 Chapter 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332

Chapter 5
Site Preparation
Pre-Installation Survey
166
NOTE
To ensure compliance with item 10 of Table 5-8, provide a copy of Appendix D to the customer
to use a worksheet to identify required names and addresses for the LAN.
Table 5-8
Site Inspection Checklist
Please check either Yes or No. If No, include comment or date
Comment
or Date
Computer room
No.
Area or condition
Yes
No
1.
Is there a completed floor plan?
2.
Is there adequate space for maintenance needs?
Front 42 in (106 cm) min., 48 in (121 cm)
recommended. Rear 32 in (81 cm) min., 36 in
(91cm) recommended
3.
Is access to the site or computer room
restricted?
4.
Is the computer room structurally complete?
Expected date of completion?
5.
Is a raised floor installed and in good condition?
What is the floor to ceiling height? [7.5 ft (228
cm) minimum]
6.
Is the raised floor adequate for equipment
loading?
7.
Are there channels or cutouts for cable routing?
8.
Is there a remote console telephone line
available with an RJ11 jack?
9.
Is a telephone line available?
9a.
Is the customer aware of the iCOD email
requirements?
Each bootable partition requires a connection to
the internet to send email to notify
Hewlett-Packard that the customer has
allocated additional CPUs beyond the amount
initially purchased. Each bootable partition
must be configured to perform this operation.
For more details, go to http://superdome.hp.com
and click on the iCOD link.
10.
Are customer supplied peripheral and LAN
cables available and of the proper type?