HP Integrity Superdome SX1000 User Guide, Sixth Edition - HP Integrity Superdo - Page 178
Table 5-8, Site Inspection Checklist, Please check either Yes or No. If No, include comment or date
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 178 highlights
Site Preparation Pre-Installation Survey NOTE To ensure compliance with item 10 of Table 5-8, provide a copy of Appendix D to the customer to use a worksheet to identify required names and addresses for the LAN. Table 5-8 Site Inspection Checklist Please check either Yes or No. If No, include comment or date Comment or Date Computer room No. Area or condition Yes No 1. Is there a completed floor plan? 2. Is there adequate space for maintenance needs? Front 42 in (106 cm) min., 48 in (121 cm) recommended. Rear 32 in (81 cm) min., 36 in (91cm) recommended 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? What is the floor to ceiling height? [7.5 ft (228 cm) minimum] 6. Is the raised floor adequate for equipment loading? 7. Are there channels or cutouts for cable routing? 8. Is there a remote console telephone line available with an RJ11 jack? 9. Is a telephone line available? 9a. Is the customer aware of the iCOD email requirements? Each bootable partition requires a connection to the internet to send email to notify Hewlett-Packard that the customer has allocated additional CPUs beyond the amount initially purchased. Each bootable partition must be configured to perform this operation. For more details, go to http://superdome.hp.com and click on the iCOD link. 10. Are customer supplied peripheral and LAN cables available and of the proper type? 166 Chapter 5