HP Integrity Superdome SX1000 User Guide, Sixth Edition - HP Integrity Superdo - Page 179
Table 5-8, Site Inspection Checklist Continued
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 179 highlights
Site Preparation Pre-Installation Survey Table 5-8 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment or date Comment or Date 11. Are floor tiles in good condition and properly braced? 12. Metallic particulate test required. Power and lighting No. Area or condition Yes No 13. Are lighting levels adequate for maintenance? 14. Are there ac outlets available for servicing needs? (i.e. vacuuming) 15. Does the input voltage correspond to equipment specifications? 15A Is dual source power used? If so, identify type(s) and evaluate grounding. 16 Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is there a dedicated branch circuit for equipment? 20. Is the dedicated branch circuit less than 250 feet (72.5 meters)? 21. Are the input circuit breakers adequate for equipment loads? Safety No. Area or condition Yes No 22. Is there an emergency power shut-off switch? 23. Is there a telephone available for emergency purposes? 24. Is there a fire protection system in the computer room? 25. Is antistatic flooring installed? Chapter 5 167