HP Integrity Superdome SX1000 User Guide, Sixth Edition - HP Integrity Superdo - Page 78
Powering on the System 48 Volts, MP Console Option
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 78 highlights
Installing the System Booting and Verifying the System Figure 2-44MP Console Option Powering on the System 48 Volts Step 1. Switch on the 48-volt supply from each cabinet front panel. If the complex has an IOX cabinet, power on this cabinet first. In a large complex cabinets should be powered on in one of the two following orders: 9, 8, 1, 0 or 8, 9, 0, 1. IMPORTANT The MP should be running in each window. As the cabinet boots, the partition(s) activity can be observed in the window displaying the VFP. Step 2. For hp Integrity Superdome systems, follow the procedure in "Booting hp Integrity Superdome to EFI Shell" on page 67. For hp 9000 Superdome systems, follow the procedure in "Booting hp 9000 to BCH Shell" on page 69. 66 Chapter 2
Chapter 2
Installing the System
Booting and Verifying the System
66
Figure 2-44MP Console Option
Powering on the System 48 Volts
Step 1.
Switch on the 48-volt supply from each cabinet front panel.
If the complex has an IOX cabinet, power on this cabinet first.
In a large complex cabinets should be powered on in one of the two following orders: 9, 8, 1, 0 or 8,
9, 0, 1.
IMPORTANT
The MP should be running in each window.
As the cabinet boots, the partition(s) activity can be observed in the window displaying the VFP.
Step 2.
For hp Integrity Superdome systems, follow the procedure in “Booting hp Integrity Superdome to
EFI Shell” on page 67.
For hp 9000 Superdome systems, follow the procedure in “Booting hp 9000 to BCH Shell” on
page 69.