HP Integrity Superdome SX1000 User Guide, Sixth Edition - HP Integrity Superdo - Page 180
Delivery Survey
View all HP Integrity Superdome SX1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 180 highlights
Site Preparation Pre-Installation Survey Table 5-8 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment or date Comment or Date 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, etc.)? Cooling No. Area or condition Yes No 27. Can cooling be maintained between 68° and 86° (20° and 30° C)? 28. Can temperature changes be held to 9° (5 ° C) per hour? 29. Can humidity level be maintained between 40% and 55%? 30. Are air conditioning filters installed and clean? Storage No. Area or condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training No. Area or Condition 33 Are personnel enrolled in the System Administrator's Course? 34 Is on-site training required? Delivery Survey The delivery survey form shown in Figure 5-18 on page 169 and Figure 5-19 on page 170 lists delivery or installation requirements. If any of the items on the list apply, enter the appropriate information in the areas provided on the form. Special instructions or recommendations should be entered on the Special Instructions or Recommendations form. Following are examples of special instructions or issues: • Packaging restrictions at the facility, such as size and weight limitations • Special delivery procedures • Special equipment required for installation, such as tracking or hoists • What time the facility is available for installation (after the equipment is unloaded) 168 Chapter 5