Panasonic 26PEK2U6 26PEK2U6 Service Manual - Page 123
Taping the Tubes, Finishing the Installation, Fig. 1-24
View all Panasonic 26PEK2U6 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 123 highlights
4. Taping the Tubes (1) At this time, the refrigerant tubes (and electrical wiring if local codes permit) should be taped together with armoring tape in 1 bundle. To prevent condensation from overflowing the drain pan, keep the drain hose separate from the refrigerant tubing. (2) Wrap the armoring tape from the bottom of the outdoor unit to the top of the tubing where it enters the wall. As you wrap the tubing, overlap half of each previous tape turn. (3) Clamp the tubing bundle to the wall, using 1 clamp approx. each meter (3 feet). (Fig. 1-24) NOTE Do not wind the armoring tape too tightly since this will decrease the heat insulation effect. Also ensure that the condensation drain hose splits away from the bundle and drips clear of the unit and the tubing. 5. Finishing the Installation After finishing insulating and taping over the tubing, use sealing putty to seal off the hole in the wall to prevent rain and draft from entering. (Fig. 1-25) 1. Specifications Inter-unit control wiring Gas tube Liquid tube Insulation Armoring tape Fig. 1-24 Apply putty here 1 Tubing Fig. 1-25 1-115