Panasonic 26PEK2U6 26PEK2U6 Service Manual - Page 201
<CZ-RWSK1U>, 27. Test Run Procedure, Wall Mounted Type K1, 28. Check Items Before the Test Run
View all Panasonic 26PEK2U6 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 201 highlights
7-27. Test Run Procedure Wall Mounted (Type K1) Check the "Check Items Before the Test Run". (Item 7-28) Verify the combination (wiring) of indoor and outdoor units. Set the indoor unit controller to "TEST". (Item 7-29-3) 1. Specifications Is operation NO possible? Check using the Diagnosis function table. (Refer to 7-32) YES Note: Check the indoor-side drainage. Return the indoor unit controller to 1 "NORM". (Item 7-29-3) 7-28. Check Items Before the Test Run (1) Turn ON the remote power switch at least 12 hours before the test run in order to charge the crankcase heater. (2) Fully open the service valves on the gas-tube and liquid-tube sides. (3) Set the sliding switches on the inside of the wireless remote controller cover to the correct settings for that model. After changing the settings, press the RESET hole. Verify that sliding switch 1 is in the "S" position. SKN Wireless remote controller transmitter Set sliding switch 2 to the correct setting for these models. AHC AHC A: Heat pump model (H: Heat pump, no auto heating/cooling) C: Cooling-only model RESET hole SENSOR button Sliding switch 1-193