Panasonic 26PEK2U6 26PEK2U6 Service Manual - Page 75
Dimensional, Indoor, Cealing Type T2, Required Minimum Space for Installation and, Service
View all Panasonic 26PEK2U6 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 75 highlights
(Suspension bolt pitch) 1-4. Dimensional Data Indoor Unit : Cealing (Type T2) Required Minimum Space for Installation and Service Dimensions of suspension bolt pitch and unit Length Type 26 inch mm 36, 42 inch mm A 48-17/64 1226 62-43/64 1541 B 50-13/64 1275 62-19/32 1590 C 9-1/4 235 9-1/4 235 Refrigerant tubing • drain hose position Left side Rear (Figure shows view from front) 1. Specifications Unit: inch (mm) Air intake (Suspension bolt pitch) Air discharge Unit: inch (mm) Right side (Liquid tubing • Gas tubing) 1 Left drain position Closed with rubber stopper at time of shipment. Left drain position Gas tubing Liquid tubing Right drain position Right drain position Unit opening position (Refrigerant tubing • drain hose • power inlet port • remote control wiring inlet port) Left-side drain hose outlet port Top outlet port Right-side drain hose outlet port Unit: inch (mm) Rear outlet port (Figure shows view from front) Side cover Outside air intake duct connection port (ø3-15/16 (100), cutout) Left-rear side drain hose outlet port (cutout) Remote control wiring and inter-unit wiring inlet port Cover of tubing hole *1 Use a compass saw, jig saw or similar tool and cut along the indented portion of the side cover and make a hole inside the cover. *2 When pulling the refrigerant tubing from the upper side, cut along the indented portion and pass the tubing through the hole. NOTE Be sure to use sealing putty to seal off the opening to prevent dust. Power Supply inlet 1-67