Panasonic 26PEK2U6 26PEK2U6 Service Manual - Page 139
Fig. 1-63, Take adequate precautions, when installing onto the, ceiling., The air-intake plenum is
View all Panasonic 26PEK2U6 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 139 highlights
(d) Installing the ceiling panel Attach the ceiling panel to the air-intake plenum. Drawing the panel downwards sets the panel in position temporarily with the panel catch (at 2 locations). Remove the socket cover of the air-intake plenum and pass the 8P sockets through it. (Fix the panel lead wire to air-intake plenum side clamper.) Connect the 3P socket (white) and 2P socket (green) to the other side of the 3P socket (white) and 2P socket (green) respectively. Reattach the socket cover. Please fix the socket cover located on the switch box after closing the lid for the switch box. Duct connection flange Installation screws (M4xL1/2", 4pcs.) Panel catch Ceiling panel 1. Specifications Duct connection box CAUTION Take adequate precautions when installing onto the ceiling. The air-intake plenum is especially prone to rupture if struck on it's side. 1 Fig. 1-63 1-131