Adaptec 1966600 User Guide - Page 39

Reinstall the PSUs. See

Page 39 highlights

Installing the DuraStor Storage Subsystem 4 Slide one of the rack's mounting rails into the slot on the left side of the RAID appliance's back panel. See Figure 3-8. Push the rail in until it fits the depth of the rack. The rail should mate with mounting slots on the rack's rear vertical member and make the appliance level and tight-fitting. Rail Slot Threaded Stud Nut GRAPHIC GOES HERE HOST IN (CH 3) DISK CH 2 HOST IN (CH 0) DISK CH 1 HOST OUT (CH 3) HOST OUT (CH 0) SERIAL B SERIAL A Ext Int Rear Rack Vertical Screws Nuts Mounting Slot Mounting Rail Figure 3-4 Attaching the Rails 5 Secure the left side rail to the rack's rear vertical member using the screws and nuts. 6 Repeat steps 6 and 7 for the other side rail. Note: Be sure that the RAID appliance is level. Check that you used mounting slots of the same height on both sides of the rack. 7 Reinstall the PSUs. See Replacing a Power Supply Unit on page 5-5. 3-5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133

3-5
Installing the DuraStor Storage Subsystem
4
Slide one of the rack’s mounting rails into the slot on the left side
of the RAID appliance’s back panel. See
Figure 3-8
.
Push the rail in until it fits the depth of the rack. The rail should
mate with mounting slots on the rack’s rear vertical member and
make the appliance level and tight-fitting.
Figure 3-4
Attaching the Rails
5
Secure the left side rail to the rack’s rear vertical member using
the screws and nuts.
6
Repeat steps 6 and 7 for the other side rail.
Note:
Be sure that the RAID appliance is level. Check that
you used mounting slots of the same height on both sides
of the rack.
7
Reinstall the PSUs. See
Replacing a Power Supply Unit
on
page 5-5
.
Ext
Int
HOST OUT (CH 0)
HOST OUT (CH 3)
HOST IN (CH 0)
HOST IN (CH 3)
DISK CH 2
DISK CH 1
SERIAL B
SERIAL A
Nut
Threaded Stud
Mounting Rail
Rear Rack Vertical
Screws
Nuts
Mounting
Slot
Rail Slot