Adaptec 1966600 User Guide - Page 45

Replacing the Front Bezel, Connecting the Power Cords

Page 45 highlights

Installing the DuraStor Storage Subsystem 2 Push the drive carrier into its bay until it seats completely. The tension clips on the drive carrier ensure that the fit is tight. Gentle but firm force may be required to completely seat the drive carrier. 3 Repeat this step to populate all the disk drive slots. Replacing the Front Bezel 1 Ensure that the front bezel lip fits under the chassis top. 2 Lock the screws by turning them one-quarter turn to the right. Connecting the Power Cords Once the DuraStor 312R storage enclosure is in place, the power cords can be attached and secured. 1 On the back of the storage enclosure, lift a security bale and plug in a power cord. 2 Place the bale over the cord. (This protects the power cord from accidental disconnection.) 3 Plug the other end of the power cord into a grounded outlet or a UPS power strip. 4 Repeat this process for the other power cord. Completing the Connections for the DuraStor 6220SS The following section describes several methods for connecting and configuring the DuraStor 6220SS storage subsystem. If you have installed the DuraStor SCSI RAID appliance or the DuraStor 312R but not both, go directly to the sections that apply to you. To complete the installation and setup of the DuraStor 6220SS s Connect the DuraStor SCSI RAID appliance to the DuraStor 312R(s). See page 3-12. s Connect the DuraStor SCSI RAID appliance to the host system. See page 3-17. s Set the host system HBA to multiple-LUN support. See page 3-22. 3-11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133

3-11
Installing the DuraStor Storage Subsystem
2
Push the drive carrier into its bay until it seats completely.
The tension clips on the drive carrier ensure that the fit is tight.
Gentle but firm force may be required to completely seat the
drive carrier.
3
Repeat this step to populate all the disk drive slots.
Replacing the Front Bezel
1
Ensure that the front bezel lip fits under the chassis top.
2
Lock the screws by turning them one-quarter turn to the right.
Connecting the Power Cords
Once the DuraStor 312R storage enclosure is in place, the power
cords can be attached and secured.
1
On the back of the storage enclosure, lift a security bale and plug
in a power cord.
2
Place the bale over the cord. (This protects the power cord from
accidental disconnection.)
3
Plug the other end of the power cord into a grounded outlet or a
UPS power strip.
4
Repeat this process for the other power cord.
Completing the Connections for the
DuraStor 6220SS
The following section describes several methods for connecting
and configuring the DuraStor 6220SS storage subsystem.
If you have installed the DuraStor SCSI RAID appliance or the
DuraStor 312R
but not both
, go directly to the sections that apply to
you. To complete the installation and setup of the DuraStor 6220SS
Connect the DuraStor SCSI RAID appliance to the
DuraStor 312R(s). See
page 3-12
.
Connect the DuraStor SCSI RAID appliance to the host system.
See
page 3-17
.
Set the host system HBA to multiple-LUN support. See
page 3-22
.