Autodesk 507B1-90A211-1301 User Guide - Page 372
Link to External Project Files, Supported Scheduling Software
UPC - 606122713288
View all Autodesk 507B1-90A211-1301 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 372 highlights
To check a schedule 1 If the TimeLiner window is not already open, click Tools ➤ TimeLiner. 2 In the TimeLiner window, the Tasks tab, right-click the tasks view, and click Check. 3 Select one of the available options: ■ Find uncontained items. Choose this to select any items in the scene that are not attached to a task, or are not contained within any other item attached to a task. NOTE A Contained item is the child of another item. For example, if you select a Group, Block or Cell which is comprised of various pieces of geometry, then that geometry is contained within the Group, Block or Cell. A Group, Block or Cell may therefore be attached to a task and although the child geometry is not directly attached itself, it is contained within an item that is attached. ■ Find contained items. Choose this to select any items in the scene that are either attached to a task or contained within any other items attached to a task. ■ Find attached items. Choose this to select any items in the scene that are directly attached to a task. ■ Find items attached to multiple tasks. Choose this to select any items in the scene that are directly attached to more than one task. ■ Find items contained in multiple tasks. Choose this to select any items in the scene that are either attached to, or contained within any other item that is attached to more than one task. ■ Find items attached to overlapping tasks. Choose this to select any items in the scene that are attached to more than one task, where the task durations overlap. ■ Find items contained in overlapping tasks. Choose this to select any items in the scene that are either attached to, or contained within any other item that is attached to more than one task, where the task durations overlap. The check results are highlighted on the Selection Tree and in the Scene Area. Link to External Project Files One of TimeLiner most powerful features is its integration with project scheduling software. A list of tasks including their start and end dates/times can be imported from a project file directly into TimeLiner. Supported Scheduling Software Autodesk Navisworks TimeLiner supports a variety of scheduling software. NOTE Some of these may only function if the relevant scheduling software is installed. 360 | Chapter 15 Simulate Construction Scheduling