IBM 8651RM0 Hardware Maintenance Manual - Page 141
Install two cage nuts to each of the two front
UPC - 087944340508
View all IBM 8651RM0 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 141 highlights
Attention To ensure rack stability, plan the installation of servers in the rack starting from the bottom. To attach the mounting hardware to the rack: 1. Remove the rack front door. Refer to the rack documentation for instructions. 2. Mark the positions of the slide-bracket assemblies, bezel brackets, and the cable-management arm on the rack: a. Position the installation template on the front mounting rails on the rack, aligning the holes. b. Mark the holes for the slide-bracket assemblies and bezel brackets. c. Install two cage nuts to each of the two front mounting brackets for the bezel brackets. d. Attach the template to the rear mounting rails. Mark the locations for the slide-bracket assemblies and cable-management arm. IBM Netfinity 7000 - Type 8651 133