IBM 8651RM0 Hardware Maintenance Manual - Page 73

SCSI port B

Page 73 highlights

1 Channel 2 2 Channel 1 3 Air baffle 4 Shuttle-support rails 5 SCSI port A 6 SCSI port B 7 Captive screws 7. If you have already installed the ServeRAID adapter, connect the cable to Channel 2 1 on the ServeRAID adapter. If you have not yet installed the ServeRAID adapter, connect the cable after you install the adapter. 8. Repeat this procedure to disconnect the SCSI cable from SCSI port A 5 on the system board and connect it to Channel 1 2 on the ServeRAID adapter. Attention If the air baffle is not installed correctly, the server will overheat. 9. Install the air baffle 3 . Make certain that the edges of the air baffle fit inside the shuttle support rails 4 . 10. Push the shuttle toward the front of the server and tighten the four screws 7 at the back of the shuttle. IBM Netfinity 7000 - Type 8651 65

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206

1
Channel 2
2
Channel 1
3
Air baffle
4
Shuttle-support rails
5
SCSI port A
6
SCSI port B
7
Captive screws
7.
If you have already installed the ServeRAID adapter,
connect the cable to Channel 2
1
on the
ServeRAID adapter.
If you have not yet installed the
ServeRAID adapter, connect the cable after you
install the adapter.
8.
Repeat this procedure to disconnect the SCSI cable
from SCSI port A
5
on the system board and
connect it to Channel 1
2
on the ServeRAID
adapter.
Attention
If the air baffle is not installed correctly, the
server will overheat.
9.
Install the air baffle
3
.
Make certain that the edges
of the air baffle fit inside the shuttle support rails
4
.
10.
Push the shuttle toward the front of the server and
tighten the four screws
7
at the back of the shuttle.
IBM Netfinity 7000 - Type 8651
65