IBM 8651RM0 Hardware Maintenance Manual - Page 72
SCSI port
UPC - 087944340508
View all IBM 8651RM0 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 72 highlights
1 Air baffle 2 Shuttle-support rails 3 Opening in shuttle 4 SCSI port A 5 SCSI port B 6 Captive screws 7 Shuttle 8 Opening in shuttle To correctly rout the ServerRAID adapter cable, do the following: 1. Loosen the four screws 6 on the shuttle at the back of the server. 2. Pull the shuttle 7 toward the back of the server. 3. Observe the way the edges of the air baffle 1 fits inside the shuttle-support rails 2 ; then, slide the air baffle toward the rear of the server and lift it out of the server. 4. Disconnect the SCSI cable from SCSI port B 5 on the system board. 5. Slide the disconnected end of the cable out through the opening 3 in the shuttle. 6. Reroute the SCSI cable through the opening 8 in the center of the shuttle. 64 Netfinity Server HMM