IBM 8681 Hardware Maintenance Manual - Page 110
Installing the server, Press in on the sides of the lift handle near
UPC - 087944642503
View all IBM 8681 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 110 highlights
Installing the server Caution Four persons are required to install the server in the rack. To install the server in the rack: 1. If the four lift handles are already not installed on the server, install the handles now. a. Press in on the sides of the lift handle near the tabs and insert the handle tabs into the slots on the sides of the server. b. Move the handle up in the slots until the hooked part of each tab is inside the server. c. Release the pressure on the sides of the handle. 102 Netfinity Server HMM
Installing the server
Caution
Four persons are required to install the server in the
rack.
To install the server in the rack:
1.
If the four lift handles are already not installed on the
server, install the handles now.
a.
Press in on the sides of the lift handle near the
tabs and insert the handle tabs into the slots on
the sides of the server.
b.
Move the handle up in the slots until the hooked
part of each tab is inside the server.
c.
Release the pressure on the sides of the handle.
102
Netfinity Server HMM