IBM 8681 Hardware Maintenance Manual - Page 112
IBM Netfinity Rack Power, Distribution Unit PDU Installation Instructions, cable-management arm.
![]() |
UPC - 087944642503
View all IBM 8681 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 112 highlights
9. Remove the lift handles from the server and store them in a safe place. Note Although the left and right slide-rail-latch assemblies come preinstalled on the server, they are detachable. If you ever remove them and need to reattach them, you must perform step 10. 10. Attach the left and right slide-rail-latch assemblies 1 to the server using two screws for each assembly. 11. Press the safety latches and slide the server about halfway into the rack enclosure. 12. Insert and route the cables on the lower cable-management arm first; then, on the upper cable-management arm. Note The server comes with three 220 V AC power cords for connection to the rack power distribution unit (PDU) in a 200-240 V AC environment. Refer to IBM Netfinity Rack Power Distribution Unit (PDU) Installation Instructions for additional information on installing the PDU. 104 Netfinity Server HMM
![](/manual_guide/products/ibm-8500r-hardware-maintenance-manual-603c304/112.png)