18 kg (37 lbs) 32 kg (70.5 lbs) Caution Use safe practices when lifting. 55 kg (121.2 lbs) 2. Move the slide-rail assemblies to the fully extended and locked position (all the way out of the rack). Note When the slide-rail assemblies are moved all the way out (fully extended), safety latches 1 lock the rails in place. To release the safety latches, press them in toward the server. 3. Lift the server and move it over the left slide-rail assembly first. Make sure that the slide-rail assembly is under the tabs 2 . The tabs are farther from the edge on the right side of the server to allow you to maneuver the slide-rail assembly under the right-side tabs after you have the slide-rail assembly under the left-side tabs. 4. Next, move the server over the right slide-rail assembly. Make sure that the slide-rail assembly is under the tabs. 5. Once the server is on both slide-rail assemblies, move it toward the rack. 6. Align the six holes 1 on the left slide-rail assembly with the matching holes on the left side of the server. 7. Install six screws through the left slide-rail assembly and into the server side. Tighten the screws. 8. Repeat steps 6 and 7 for the right slide-rail assembly. This secures the server. Netfinity 8500R - Type 8681 103

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290

Caution
Use safe practices when lifting.
2.
Move the slide-rail assemblies to the fully extended
and locked position (all the way out of the rack).
Note
When the slide-rail assemblies are moved all the
way out (fully extended), safety latches
±1²
lock
the rails in place.
To release the safety latches,
press them in toward the server.
3.
Lift the server and move it over the
left
slide-rail
assembly first.
Make sure that the slide-rail assembly
is under the tabs
±2²
.
The tabs are farther from the edge on the right side of
the server to allow you to maneuver the slide-rail
assembly under the right-side tabs
after
you have the
slide-rail assembly under the left-side tabs.
4.
Next, move the server over the
right
slide-rail
assembly.
Make sure that the slide-rail assembly is
under the tabs.
5.
Once the server is on both slide-rail assemblies,
move it toward the rack.
6.
Align the six holes
±1²
on the left slide-rail assembly
with the matching holes on the left side of the server.
7.
Install six screws through the left slide-rail assembly
and into the server side.
Tighten the screws.
8.
Repeat steps 6 and 7 for the right slide-rail assembly.
This secures the server.
±
18 kg (37 lbs)
±
32 kg (70.5 lbs)
±
55 kg (121.2 lbs)
Netfinity 8500R - Type 8681