IBM 8681 Hardware Maintenance Manual - Page 64
Completing the installation, Installing the top cover
![]() |
UPC - 087944642503
View all IBM 8681 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 64 highlights
Completing the installation Depending on the options that you have installed, you must reinstall the top cover and the front bezel to complete the installation. You must also reconnect all the cables that you disconnected in "Preparing to install options" on page 134, and, after installing certain options, you must run the Configuration/Setup utility program. Follow the instructions in this section. Installing the top cover Notes 1. The top cover is in place during normal operation. If the server is on, do not leave the top cover off for more than 30 minutes at a time. 2. If necessary, see "Input/output connectors and expansion slots" on page 122 for connector locations. To install the server top cover: 1. Before installing the top cover, check that all cables, adapters, and other components are installed and seated correctly and that you have not left tools or loose parts inside the server. 2. Place the cover-release latch 1 in the open (up) position. 3. Insert the bottom tabs of the cover 2 in the matching slots in the server chassis. 4. Close the cover-release latch to pull the cover forward and lock the cover in place. 56 Netfinity Server HMM
![](/manual_guide/products/ibm-8500r-hardware-maintenance-manual-603c304/64.png)