IBM HS22 User Guide - Page 68

Completing the installation, source. Always replace the blade server cover before installing the blade

Page 68 highlights

Completing the installation To complete the installation, complete the following tasks. 1. Reinstall the optional expansion unit, if you removed one to install other devices (see "Installing an optional expansion unit" on page 25 for information on installing the expansion unit). 2. Close the blade server cover, unless you installed an optional expansion unit that has its own cover (see "Closing the blade server cover" on page 55). Statement 21 CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade server cover before installing the blade server. 3. Reinstall the blade server into the BladeCenter unit (see "Installing the blade server in a BladeCenter unit" on page 56). 4. Turn on the blade server (see "Turning on the blade server" on page 18).If you have just connected the power cords of the BladeCenter unit to electrical outlets, you must wait until the power-on LED on the blade server flashes slowly before you press the power-control button. 5. For certain optional devices, you might have to run the blade server Setup utility to configure the blade server (see Chapter 4, "Configuring the blade server," on page 59). See the documentation that comes with your optional device for additional information. 54 BladeCenter HS22 Type 7870, 1936, and 1911: Installation and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110

Completing the installation
To complete the installation, complete the following tasks.
1.
Reinstall the optional expansion unit, if you removed one to install other
devices (see “Installing an optional expansion unit” on page 25 for information
on installing the expansion unit).
2.
Close the blade server cover, unless you installed an optional expansion unit
that has its own cover (see “Closing the blade server cover” on page 55).
Statement 21
CAUTION:
Hazardous energy is present when the blade server is connected to the power
source. Always replace the blade server cover before installing the blade
server.
3.
Reinstall the blade server into the BladeCenter unit (see “Installing the blade
server in a BladeCenter unit” on page 56).
4.
Turn on the blade server (see “Turning on the blade server” on page 18).If you
have just connected the power cords of the BladeCenter unit to electrical
outlets, you must wait until the power-on LED on the blade server flashes
slowly before you press the power-control button.
5.
For certain optional devices, you might have to run the blade server Setup
utility to configure the blade server (see Chapter 4, “Configuring the blade
server,” on page 59). See the documentation that comes with your optional
device for additional information.
54
BladeCenter HS22 Type 7870, 1936, and 1911: Installation and User's Guide