Intel SR2600UR Service Guide - Page 138
Installing the Server Board, Installing the Large Air Baffle
UPC - 735858206778
View all Intel SR2600UR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 138 highlights
Installing the Server Board To install the server board, follow these steps: 1. Place the server board into the server system (see letter "A" in Figure 110). 2. Attach the server board with nine screws (see letter "B" in Figure 110). A B AF002981 Figure 110. Installing the Server Board 3. Connect all power cables to the server board. 4. Install memory. For instructions, see "Installing DIMMs" on page 58. 5. Install the processor(s). For instructions, see "Installing the Processor" on page 59. 6. Install processor heatsink(s). For instructions, see "Installing the Heatsink(s)" on page 62. 7. Install the fan module assembly. For instructions, see "Replacing a Fan Module" on page 127. 8. Install the large air baffle. For instructions, see "Installing the Large Air Baffle" on page 70. 9. Install the bridge board. For instructions, see step 6 in "Installing the Midplane Board" on page 104. 118 Intel® Server System SR2600UR/SR2625UR Service Guide