Sanyo 26KHS72R Installation Instructions - Page 33
Fig. 3-18
![]() |
View all Sanyo 26KHS72R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 33 highlights
07-115 SSHP_II 5/7/07 3:59 PM Page 33 (d) Installing the ceiling panel G Attach the ceiling panel to the chamber. Drawing the panel downwards sets the panel in position temporarily with the panel catch (at 2 locations). G Remove the socket cover of the air-intake plenum and pass the 8P sockets through it. (Fix the panel lead wire with the chamber side clamp.) (Fig. 3-17) G Connect the 8P socket (electrical component box side) to the 8P socket (ceiling panel side) of the indoor unit electrical component box. G Reattach the socket cover. Duct connection flange Installation screws (M4 × 1/2 in.) Panel catch Ceiling panel Duct connection box X Fig. 3-18 33
![](/manual_guide/products/sanyo-26khs72r-installation-instructions-5d29d01/33.png)
33
X
(d) Installing the ceiling panel
●
Attach the ceiling panel to the chamber. Drawing the
panel downwards sets the panel in position temporarily
with the panel catch (at 2 locations).
●
Remove the socket cover of the air-intake plenum and
pass the 8P sockets through it. (Fix the panel lead wire
with the chamber side clamp.) (Fig. 3-17)
●
Connect the 8P socket (electrical component box side)
to the 8P socket (ceiling panel side) of the indoor unit
electrical component box.
●
Reattach the socket cover.
Ceiling panel
Panel catch
Installation screws
(M4
×
1/2 in.)
Duct
connection
flange
Duct connection box
Fig. 3-18
07-115 SSHP_II
5/7/07
3:59 PM
Page 33