Sanyo 26KHS72R Installation Instructions - Page 7

How To Install The System Controller

Page 7 highlights

07-115 SSHP_II 5/7/07 3:59 PM Page 7 Page 7-12. Separate Type Signal Receiving Unit Installation 7-13. Electrical Wiring 7-14. Test Run Switch 7-15. Misoperation Alarm Indicators 7-16. Basic Wiring Diagram 7-17. Wiring System Diagram for Group Control 7-18. Wiring System Diagram for Multiple Remote Controllers 7-19. Test Run Procedure 7-20. Check Items Before the Test Run 7-21. Preparing for the Test Run 7-22. Precautions 7-23. When Setting Indoor Unit Control PCB Switch for Wall-Mounted Indoor Unit 8. HOW TO INSTALL THE SYSTEM CONTROLLER (OPTIONAL PART 85 8-1. System Controller Installation 8-2. Electrical Wiring 8-3. Address Switch Setting 8-4. Mode Setting 8-5. How to Perform Zone Registration 8-6. Connection with Other Equipment 8-7. Memory Back Up Switch 8-8. Test Run 9. HOW TO PROCESS TUBING 97 9-1. Connecting the Refrigerant Tubing 9-2. Connecting Tubing between Indoor and Outdoor Units 9-3. Insulating the Refrigerant Tubing 9-4. Taping the Tubes 9-5. Finishing the Installation 10. LEAK TEST, EVACUATION AND ADDITIONAL REFRIGERANT CHARGE 101 10-1. Leak Test 10-2. Evacuation 10-3. Charging Additional Refrigerant 10-4. Finishing the Job 11. TEST RUN 104 11-1. Preparing for Test Run 11-2. Caution 11-3. Test Run Procedure 11-4. Items to Check Before the Test Run 11-5. Test Run Using the Remote Controller 11-6. Precautions 11-7. Table of Self-Diagnostic Functions and Corrections (X, T, U, K Type) 11-8. Examples of Wiring Diagrams 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111

7
<RCS-BH80UA.WL>
7-12.
Separate Type Signal Receiving Unit Installation
7-13.
Electrical Wiring
7-14.
Test Run Switch
7-15.
Misoperation Alarm Indicators
7-16.
Basic Wiring Diagram
7-17.
Wiring System Diagram for Group Control
7-18.
Wiring System Diagram for Multiple Remote Controllers
<RCS-SH1UA>
7-19.
Test Run Procedure
7-20.
Check Items Before the Test Run
7-21.
Preparing for the Test Run
7-22.
Precautions
7-23.
When Setting Indoor Unit Control PCB Switch for
Wall-Mounted Indoor Unit
8.
HOW TO INSTALL THE SYSTEM CONTROLLER
(OPTIONAL PART) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .85
8-1.
System Controller Installation
8-2.
Electrical Wiring
8-3.
Address Switch Setting
8-4.
Mode Setting
8-5.
How to Perform Zone Registration
8-6.
Connection with Other Equipment
8-7.
Memory Back Up Switch
8-8.
Test Run
9.
HOW TO PROCESS TUBING . . . . . . . . . . . . . . . . . . . . . . . . . 97
9-1.
Connecting the Refrigerant Tubing
9-2.
Connecting Tubing between Indoor and
Outdoor Units
9-3.
Insulating the Refrigerant Tubing
9-4.
Taping the Tubes
9-5.
Finishing the Installation
10.LEAK TEST, EVACUATION AND ADDITIONAL
REFRIGERANT CHARGE
. . . . . . . . . . . . . . . . . . . . . . . . . 101
10-1.
Leak Test
10-2.
Evacuation
10-3.
Charging Additional Refrigerant
10-4.
Finishing the Job
11. TEST RUN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
11-1.
Preparing for Test Run
11-2.
Caution
11-3.
Test Run Procedure
11-4.
Items to Check Before the Test Run
11-5.
Test Run Using the Remote Controller
11-6.
Precautions
11-7.
Table of Self-Diagnostic Functions and Corrections
(X, T, U, K Type)
11-8.
Examples of Wiring Diagrams
Page
07-115 SSHP_II
5/7/07
3:59 PM
Page 7