Sanyo 26KHS72R Installation Instructions - Page 70

Caution

Page 70 highlights

07-115 SSHP_II 5/7/07 4:00 PM Page 70 4-Way Air Discharge Semi-concealed Type (X Type) 7-5. Indicator Section Installation X Remove the ceiling panel and indicator cover and install the indicator section. Air intake grille Mark section (indicator section) (1) Remove the ceiling panel. (2) Remove the corner cover behind the mark sec- tion. (3 screws) (3) Remove the mark section inside the ceiling panel. (2 screws) (4) Install the indicator section in the location where the mark section was attached. (2 screws) (5) Form the wire to match the panel ribs as shown in Fig. 7-6. (6) Install the corner cover. (Restrain the wire with the corner cover.) 3 screws Ceiling panel Fig. 7-5 Corner cover 7-6. Operating Controller Installation Do not twist the operating CAUTION controller wires together with the power supply wires. Doing so can result in malfunction. If electrical noise is induced in the unit power supply, take appropriate measures, for example installing a noise filter. 2 screws Install the operating controller at the indoor unit intake port section. (1) Fasten the operating controller to the indoor unit intake port section (electrical component box opposite side) with the 2 accessory screws (4 × L13/32 in.). Pass the wiring through under the shaft. Indicator section Fig. 7-6 Wiring (2) Connect the operating controller 2 wires (WHT, BLK) to the remote control wire (WHT) in the electrical component box. (For details on wiring, see "7-9. Electrical wiring" on page 72.) (3) Install the ceiling panel. (4) Connect the indicator section and the operating controller with the 6P connector (white). Operating controller Screws Electrical component box (5) Form the wires with vinyl clamps and fasten. Fig. 7-7 (6) Connect the ceiling panel wiring connector (2P, 3P) to the body connector in the electrical component box. (7) For details on test operation, see "Test Run." 70

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111

X
70
<RC
S
-
S
H
8
0UA.WL>
4-Way Air Di
s
char
g
e
S
emi-concealed Ty
p
e
(X Ty
p
e)
7-5. Indicator
S
ection In
s
tallation
Remove the ceilin
g
p
anel and indicator cover
and in
s
tall the indicator
s
ection.
(1)
Remove the ceili
ng
pa
n
el.
(2)
Remove the cor
n
er cover behi
n
d the mark
s
ec-
tio
n
. (
3
s
crew
s
)
(
3
)
Remove the mark
s
ectio
n
i
ns
ide the ceili
ng
pa
n
el.
(2
s
crew
s
)
(4)
I
ns
tall the i
n
dicator
s
ectio
n
i
n
the locatio
n
where
the mark
s
ectio
n
wa
s
attached. (2
s
crew
s
)
(5)
Form the wire to match the pa
n
el rib
s
a
s
s
how
n
i
n
Fi
g
. 7-6.
(6)
I
ns
tall the cor
n
er cover. (Re
s
trai
n
the wire with
the cor
n
er cover.)
7-6. O
p
eratin
g
Controller In
s
tallation
Do not twi
s
t the o
p
eratin
g
controller wire
s
to
g
ether
with the
p
ower
s
u
pp
ly
wire
s
. Doin
g
s
o can re
s
ult
in malfunction.
If electrical noi
s
e i
s
induced
in the unit
p
ower
s
u
pp
ly,
take a
pp
ro
p
riate mea
s
ure
s
,
for exam
p
le in
s
tallin
g
a
noi
s
e filter.
I
ns
tall the operati
ng
co
n
troller at the i
n
door
un
it i
n
take
port
s
ectio
n
.
(1)
Fa
s
te
n
the operati
ng
co
n
troller to the i
n
door
un
it
i
n
take port
s
ectio
n
(electrical compo
n
e
n
t box
oppo
s
ite
s
ide) with the 2 acce
ss
ory
s
crew
s
(4
×
L1
3
/
3
2 i
n
.).
(2)
Co
nn
ect the operati
ng
co
n
troller 2 wire
s
(WHT,
BLK) to the remote co
n
trol wire (WHT) i
n
the
electrical compo
n
e
n
t box. (For detail
s
o
n
wiri
ng
,
s
ee “7-9. Electrical wiri
ng
” o
n
pa
g
e 72.)
(
3
)
I
ns
tall the ceili
ng
pa
n
el.
(4)
Co
nn
ect the i
n
dicator
s
ectio
n
a
n
d the operati
ng
co
n
troller with the 6P co
nn
ector (white).
(5)
Form the wire
s
with vi
n
yl clamp
s
a
n
d fa
s
te
n
.
(6)
Co
nn
ect the ceili
ng
pa
n
el wiri
ng
co
nn
ector (2P,
3
P) to the body co
nn
ector i
n
the electrical compo-
n
e
n
t box.
(7)
For detail
s
o
n
te
s
t operatio
n
,
s
ee “Te
s
t R
un
.”
CAUTION
Ceili
ng
pa
n
el
Air i
n
take
g
rille
Mark
s
ectio
n
(i
n
dicator
s
ectio
n
)
Fi
g
. 7-5
Cor
n
er cover
3
s
crew
s
Fi
g
. 7-6
2
s
crew
s
I
n
dicator
s
ectio
n
Wiri
ng
Pa
ss
the wiri
ng
thro
ug
h
un
der the
s
haft.
Fi
g
. 7-7
Electrical
compo
n
e
n
t box
Operati
ng
co
n
troller
S
crew
s
07-115 SSHP_II
5/7/07
4:00 PM
Page 70