Compaq ProLiant 1000 User Guide: Online Storage Controller Recovery Option - Page 36
Switch Installation in a Rack Mount
View all Compaq ProLiant 1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
3-8 Planning and Installing the Online Storage Controller Switch Installation in a Rack Mount To install the Recovery Server Switch in a rack-mount ProLiant Storage System/F or /U: 1. Make sure the power on the ProLiant Storage System is turned off. 2. Looking at the back of the ProLiant Storage System, locate the original Fast-Wide SCSI interface module. Press the release tabs and remove the module as shown in Figure 3-3. FIG061.EPS Figure 3-3. Removing the Fast-Wide SCSI Interface Module in a Rack-Mount Server 3. Carefully slide in the Recovery Server Switch (part number 007678-001) as shown in Figure 3-4. Close the release tabs to lock the module into place.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3-8
Planning and Installing the Online Storage Controller
Switch Installation in a Rack Mount
To install the Recovery Server Switch in a rack-mount ProLiant Storage
System/F or /U:
1.
Make sure the power on the ProLiant Storage System is turned off.
2.
Looking at the back of the ProLiant Storage System, locate the original
Fast-Wide SCSI interface module. Press the release tabs and remove the
module as shown in Figure 3-3.
FIG061.EPS
Figure 3-3.
Removing the Fast-Wide SCSI Interface Module in a Rack-Mount Server
3.
Carefully slide in the Recovery Server Switch (part number 007678-001)
as shown in Figure 3-4. Close the release tabs to lock the module
into place.