HP StorageWorks 4/16 HP StorageWorks DC and DC04 SAN Backbone Director Switche - Page 183

Installing a core switch blade, Core switch blade CR4S-8

Page 183 highlights

Figure 68 Core switch blade (CR4S-8) Installing a core switch blade To install a CR blade (slot 3 or 6): CAUTION: Wear a grounded ESD strap when handling a CR4S-8 blade. Use the grounding connections above the power connectors on the chassis. 1. Open the ejector handles to approximately 45 degrees, and then orient the CR blade so that the handles are toward you and the flat metal side is on the bottom. 2. Align the flat metal side of the core switch blade inside the left and right blade guides in the slot, and then slide the core switch blade into the slot until it is firmly seated (see Figure 68). 3. Tighten the thumb screw inside each handle using the Phillips screwdriver. 4. Turn the core switch blade on by sliding the ON/OFF switch in the left handle to the left to cover the thumb screw. 5. Verify that the power LED is green (this may require a few seconds). If not, ensure that the core switch blade has power and is firmly seated and that the ejectors are in the locked position. 6. Connect to the new core switch blade. 7. Pack the faulty core switch blade in the packaging provided with the new core switch blade, and contact the DC04 SAN Director supplier for the procedure for returning the faulty blade. HP StorageWorks DC and DC04 SAN Backbone Director Switches 183

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256

Figure 68 Core switch blade (CR4S-8)
Installing a core switch blade
To install a CR blade (slot 3 or 6):
CAUTION:
Wear a grounded ESD strap when handling a CR4S-8 blade. Use the grounding connections above
the power connectors on the chassis.
1.
Open the ejector handles to approximately 45 degrees, and then orient the CR blade so that the
handles are toward you and the flat metal side is on the bottom.
2.
Align the flat metal side of the core switch blade inside the left and right blade guides in the slot,
and then slide the core switch blade into the slot until it is firmly seated (see
Figure 68
).
3.
Tighten the thumb screw inside each handle using the Phillips screwdriver.
4.
Turn the core switch blade on by sliding the ON/OFF switch in the left handle to the left to cover
the thumb screw.
5.
Verify that the power LED is green (this may require a few seconds). If not, ensure that the core
switch blade has power and is firmly seated and that the ejectors are in the locked position.
6.
Connect to the new core switch blade.
7.
Pack the faulty core switch blade in the packaging provided with the new core switch blade,
and contact the DC04 SAN Director supplier for the procedure for returning the faulty blade.
HP StorageWorks DC and DC04 SAN Backbone Director Switches
183