HP StorageWorks 4/16 HP StorageWorks DC and DC04 SAN Backbone Director Switche - Page 84

Verifying operation of the new CP blade

Page 84 highlights

7. Verify the installation. See "Verifying operation of the new CP blade" on page 84. 8. Replace the chassis door. See "Installing the chassis door" on page 74. Verifying operation of the new CP blade To verify that boot and POST are complete on the new CP blade and that the CP blade has achieved failover redundancy: 1. Log into the active CP as admin. 2. Enable the redundancy feature using the haEnable command. 3. Verify that HA is enabled using the haShow command. The command output includes HA Enabled Heartbeat Up and HA-state in sync. If not, POST is not complete or the CP blades have not achieved redundancy. Wait one or two minutes and re-enter the command until you can verify that redundancy has been achieved. 4. Type slotShow. The command output shows the new CP blade as "enabled": swDir:admin> slotShow Slot Blade Type ID Status 1 SW BLADE 16 2 SW BLADE 16 3 SW BLADE 16 4 SW BLADE 16 5 CR BLADE 17 6 CP BLADE 18 7 CP BLADE 18 8 CR BLADE 17 9 SW BLADE 16 10 SW BLADE 16 11 SW BLADE 16 12 SW BLADE 16 ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED ENABLED swDir:admin> 5. Type firmwareShow to determine the Fabric OS version. This example shows sample output for the firmwareShow command: swDir:admin> firmwareShow Local CP (Slot 7, CP1): Active Primary partition: v6.0.0 Secondary Partition: v6.0.0 Remote CP (Slot 6, CP0): Standby Primary partition: v6.0.0 Secondary Partition: v6.0.0 Note: If Local CP and Remote CP have different versions of firmware, please retry firmwaredownload command. swDir:admin> 6. If the firmware version on the replacement blade does not match that on the active CP blade, bring the replacement blade to the same firmware level as the active blade. 84 Replacing DC SAN Director field-replaceable units (FRUs)

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256

7.
Verify the installation. See “
Verifying operation of the new CP blade
” on page 84.
8.
Replace the chassis door. See “
Installing the chassis door
” on page 74.
Verifying operation of the new CP blade
To verify that boot and POST are complete on the new CP blade and that the CP blade has achieved
failover redundancy:
1.
Log into the active CP as admin.
2.
Enable the redundancy feature using the
haEnable
command.
3.
Verify that HA is enabled using the
haShow
command. The command output includes
HA
Enabled Heartbeat Up
and
HA-state in sync
.
If not, POST is not complete or the CP blades have not achieved redundancy. Wait one or two
minutes and re-enter the command until you can verify that redundancy has been achieved.
4.
Type
slotShow
. The command output shows the new CP blade as “enabled”:
swDir:admin>
slotShow
Slot
Blade Type
ID
Status
---------------------------------
1
SW BLADE
16
ENABLED
2
SW BLADE
16
ENABLED
3
SW BLADE
16
ENABLED
4
SW BLADE
16
ENABLED
5
CR BLADE
17
ENABLED
6
CP BLADE
18
ENABLED
7
CP BLADE
18
ENABLED
8
CR BLADE
17
ENABLED
9
SW BLADE
16
ENABLED
10
SW BLADE
16
ENABLED
11
SW BLADE
16
ENABLED
12
SW BLADE
16
ENABLED
swDir:admin>
5.
Type
firmwareShow
to determine the Fabric OS version.
This example shows sample output for the
firmwareShow
command:
swDir:admin>
firmwareShow
Local CP (Slot 7, CP1): Active
Primary partition:
v6.0.0
Secondary Partition:
v6.0.0
Remote CP (Slot 6, CP0): Standby
Primary partition:
v6.0.0
Secondary Partition:
v6.0.0
Note: If Local CP and Remote CP have different versions
of firmware, please retry firmwaredownload command.
swDir:admin>
6.
If the firmware version on the replacement blade does not match that on the active CP blade,
bring the replacement blade to the same firmware level as the active blade.
Replacing DC SAN Director field-replaceable units (FRUs)
84