HP StorageWorks 4/16 HP StorageWorks DC and DC04 SAN Backbone Director Switche - Page 200

Power-on the DC04 SAN Director., Connect the power cords to the power supplies and the power outlets.

Page 200 highlights

4. Use a pallet jack or other assisted lift to transport the new chassis to the installation area. Doorways must be wider than 91 cm (36 in) to accommodate the chassis on the pallet. 5. Use a lift to raise the chassis to the correct level. If installing the chassis in a cabinet, follow the instructions provided by the rack kit manufacturer. Installing components into the new chassis Install the field replaceable units (FRUs) in the chassis. CAUTION: Wear a grounded ESD strap when handling DC04 SAN Director components and port blades. The chassis provides a grounding connection above the power connectors. Also, store ESD-sensitive components in antistatic packaging. 1. Replace the WWN bezel (logo plate) and WWN cards (see "Installing the WWN bezel (logo plate) and WWN card" on page 191). 2. Replace the blower assemblies (see "Installing a blower assembly" on page 186). 3. Replace the power supplies or filler panels (see "Installing a power supply" on page 184). 4. Replace the control processor blades (CP8) (see "Installing a control processor blade (CP8)" on page 179). 5. Replace the core switch blades (CR8) (see "Installing a core switch blade" on page 183). 6. Replace the port blades or filler panels (see "Installing a blade" on page 173). 7. Replace the cable management fingers (see "Installing a cable management finger assembly" on page 171). 8. Connect the power cords to the power supplies and the power outlets. 9. Replace the chassis door (see Installing the chassis door). 10. Power-on the DC04 SAN Director. 11. The DC04 SAN Director performs a power-on self-test (POST). The POST takes a minimum of three minutes and is complete when LED activity returns to standard state. 12. Verify that the DC04 SAN Director is powered on and POST is complete (all power LED indicators on the port, control processor, and core switch blades should be a steady green). 13. Verify that all components are functioning correctly by checking their LEDs. If the LEDs do not indicate correct operation, try reinstalling the corresponding component. Configuring the new chassis serial number To configure a new chassis serial number: 200 Replacing DC04 SAN Director field-replaceable units (FRUs)

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256

4.
Use a pallet jack or other assisted lift to transport the new chassis to the installation area. Doorways
must be wider than 91 cm (36 in) to accommodate the chassis on the pallet.
5.
Use a lift to raise the chassis to the correct level. If installing the chassis in a cabinet, follow the
instructions provided by the rack kit manufacturer.
Installing components into the new chassis
Install the field replaceable units (FRUs) in the chassis.
CAUTION:
Wear a grounded ESD strap when handling DC04 SAN Director components and port blades. The
chassis provides a grounding connection above the power connectors. Also, store ESD-sensitive
components in antistatic packaging.
1.
Replace the WWN bezel (logo plate) and WWN cards (see
Installing the WWN bezel (logo plate) and WWN card
” on page 191).
2.
Replace the blower assemblies (see “
Installing a blower assembly
” on page 186).
3.
Replace the power supplies or filler panels (see “
Installing a power supply
” on page 184).
4.
Replace the control processor blades (CP8) (see
Installing a control processor blade (CP8)
” on page 179).
5.
Replace the core switch blades (CR8) (see “
Installing a core switch blade
” on page 183).
6.
Replace the port blades or filler panels (see “
Installing a blade
” on page 173).
7.
Replace the cable management fingers (see
Installing a cable management finger assembly
” on page 171).
8.
Connect the power cords to the power supplies and the power outlets.
9.
Replace the chassis door (see
Installing the chassis door
).
10.
Power-on the DC04 SAN Director.
11.
The DC04 SAN Director performs a power-on self-test (POST). The POST takes a minimum of
three minutes and is complete when LED activity returns to standard state.
12.
Verify that the DC04 SAN Director is powered on and POST is complete (all power LED indicators
on the port, control processor, and core switch blades should be a steady green).
13.
Verify that all components are functioning correctly by checking their LEDs. If the LEDs do not
indicate correct operation, try reinstalling the corresponding component.
Configuring the new chassis serial number
To configure a new chassis serial number:
Replacing DC04 SAN Director field-replaceable units (FRUs)
200