HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 125
Status, State, Hardware View, Close, IPLing, No Link, Synchronizing CTP2s, Send firmware complete
View all HP Surestore 64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 125 highlights
Manage Firmware Versions to show percent completion of the download. The bar progresses to 50% when the last file is transmitted to the first CTP2 card. The bar remains at the 50% point until the director performs an Initial Program Load (IPL) (indicated by an "IPLing" message). During the IPL, the director-to-HAFM server link drops momentarily and the following occurs at the Product Manager: ■ As the network connection drops, the director Status table turns yellow, the Status field displays No Link, and the State field displays a reason message. ■ The alert panel at the bottom of the navigation control panel displays a gray square, indicating director status is unknown. ■ Illustrated FRUs in the Hardware View page are removed, and then displayed again as the connection is re-established. After the IPL, a "Synchronizing CTP2s" message displays. This message remains as files are transmitted to the second CTP2 card and the progress bar travels across the dialog box to 100%. When the download reaches 100%, a "Send firmware complete" message displays. 8. Click Close to close the dialog box. 9. Click Close. Director 2/64 Installation Guide 125