HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 70

Positioning the sliding shelf bracket at the rack front, Recommended Cable Management

Page 70 highlights

Installing and Configuring the Director 2/64 Figure 28: Positioning the sliding shelf bracket at the rack front Recommended Cable Management Perform the following procedure after installing a switch, as shown in Figure 29: 1. Install two cable restraints (1) on each side of the rack in positions that will hold the Fibre Channel cables away from the power supply. 2. Form loose bundles of the installed Fibre Channel cables (2) on each side of the rack. 3. Wrap the cable bundles with the cable restraints (1) in two positions on each side of the rack to maintain clearance for power supply access (3). 70 Director 2/64 Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148

Installing and Configuring the Director 2/64
70
Director 2/64 Installation Guide
Figure 28:
Positioning the sliding shelf bracket at the rack front
Recommended Cable Management
Perform the following procedure after installing a switch, as shown in
Figure 29
:
1.
Install two cable restraints (
1
) on each side of the rack in positions that will
hold the Fibre Channel cables away from the power supply.
2.
Form loose bundles of the installed Fibre Channel cables (
2
) on each side of
the rack.
3.
Wrap the cable bundles with the cable restraints (
1
) in two positions on each
side of the rack to maintain clearance for power supply access (
3
).