HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 68
Installing the sliding shelf brackets,
View all HP Surestore 64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 68 highlights
Installing and Configuring the Director 2/64 Figure 26: Installing the sliding shelf brackets 6. Insert the shelf into the rack so that both rail rear slots (1) slide over the loose screws (2) on the inside face of each bracket, as shown in Figure 27. 68 Director 2/64 Installation Guide
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
-
26
-
27
-
28
-
29
-
30
-
31
-
32
-
33
-
34
-
35
-
36
-
37
-
38
-
39
-
40
-
41
-
42
-
43
-
44
-
45
-
46
-
47
-
48
-
49
-
50
-
51
-
52
-
53
-
54
-
55
-
56
-
57
-
58
-
59
-
60
-
61
-
62
-
63
-
64
-
65
-
66
-
67
-
68
-
69
-
70
-
71
-
72
-
73
-
74
-
75
-
76
-
77
-
78
-
79
-
80
-
81
-
82
-
83
-
84
-
85
-
86
-
87
-
88
-
89
-
90
-
91
-
92
-
93
-
94
-
95
-
96
-
97
-
98
-
99
-
100
-
101
-
102
-
103
-
104
-
105
-
106
-
107
-
108
-
109
-
110
-
111
-
112
-
113
-
114
-
115
-
116
-
117
-
118
-
119
-
120
-
121
-
122
-
123
-
124
-
125
-
126
-
127
-
128
-
129
-
130
-
131
-
132
-
133
-
134
-
135
-
136
-
137
-
138
-
139
-
140
-
141
-
142
-
143
-
144
-
145
-
146
-
147
-
148
Installing and Configuring the Director 2/64
68
Director 2/64 Installation Guide
Figure 26:
Installing the sliding shelf brackets
6.
Insert the shelf into the rack so that both rail rear slots (
1
) slide over the loose
screws (
2
) on the inside face of each bracket, as shown in
Figure 27
.