HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 63

Preparing the rear rack columns, Prepare the Switch for Installation

Page 63 highlights

Installing and Configuring the Director 2/64 Note: Two sheet metal nuts should be on each back column face (3). Figure 21: Preparing the rear rack columns Prepare the Switch for Installation The following section describes how to install the mounting hardware that attaches the switch to the rails. This hardware includes: ■ Two front mounting brackets ■ Two rear mounting plates ■ Eight 10-32, flat-head Phillips screws Use these steps to secure the mounting hardware to the switch, as shown in Figure 22: 1. Locate the two front mounting brackets in the shipping carton. 2. Position the front mounting bracket (5) so that the bracket's angled side faces out and is on the upper part of switch side. Director 2/64 Installation Guide 63

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148

Installing and Configuring the Director 2/64
63
Director 2/64 Installation Guide
Note:
Two sheet metal nuts should be on each back column face (
3
).
Figure 21:
Preparing the rear rack columns
Prepare the Switch for Installation
The following section describes how to install the mounting hardware that
attaches the switch to the rails. This hardware includes:
Two front mounting brackets
Two rear mounting plates
Eight 10-32, flat-head Phillips screws
Use these steps to secure the mounting hardware to the switch, as shown in
Figure 22
:
1.
Locate the two front mounting brackets in the shipping carton.
2.
Position the front mounting bracket (
5
) so that the bracket’s angled side faces
out and is on the upper part of switch side.