HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 59

Rail tray mounting location requirement, the left and one on the right.

Page 59 highlights

Installing and Configuring the Director 2/64 Figure 16: Rail tray mounting location requirement 4. Position and attach both rear brackets, as shown in Figure 17: a. Locate the lowest U of the 9Us chosen for mounting the switch (the lowest being U1). b. Attach each rear rail tray bracket to the rear rack uprights at U1 (one on the left and one on the right. c. Secure each rail tray bracket using one M5 Torx screw. Director 2/64 Installation Guide 59

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148

Installing and Configuring the Director 2/64
59
Director 2/64 Installation Guide
Figure 16:
Rail tray mounting location requirement
4.
Position and attach both rear brackets, as shown in
Figure 17
:
a.
Locate the lowest U of the 9Us chosen for mounting the switch (the
lowest being U1).
b.
Attach each rear rail tray bracket to the rear rack uprights at U1 (one on
the left and one on the right.
c.
Secure each rail tray bracket using one M5 Torx screw.