HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 67
AC power connections, Sliding Shelf Installation-For an HAFM Server only,
View all HP Surestore 64 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 67 highlights
Installing and Configuring the Director 2/64 3. Connect the other ends of the PDU power cords to separate PDUs (if installed), as shown in Figure 25; otherwise, connect the two standard AC power cords. Note: Hewlett-Packard recommends installing an optional PDU in the rack. Hewlett-Packard ships two PDU power cords with the Director 2/64. Figure 25: AC power connections WARNING: Hewlett-Packard power cords are provided for each director power supply. To prevent personal injury by electric shock, use only the supplied power cords. Also, verify that the facility power receptacle is the correct type, supplies the required voltage, and is properly grounded. 4. Connect the equipment rack power cords to separate (for redundancy) facility power sources, providing single-phase, 120 to 240 VAC current. Sliding Shelf Installation-For an HAFM Server only This section only applies to a Management Station. Use the following procedure to install sliding shelf brackets, as shown in Figure 26: 1. Select a U slot above the switch. (It is recommended to select the U slot immediately above the switch. However, other U slots above the switch may also be used.) 2. On each rack rear column, locate the hole (1) that is 2 holes up from the EIA number of the selected U slot (3). 3. Line up this hole with the threaded hole on the sliding shelf bracket's side. 4. Using a screw (2), attach bracket (5) to the rack. 5. Attach another screw (4) loosely in the hole on the inside face of the mounting bracket (5). Director 2/64 Installation Guide 67