HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 71

Recommended cable management, Power-On Self Test

Page 71 highlights

Installing and Configuring the Director 2/64 Figure 29: Recommended cable management Power-On Self Test Use the following steps to run a Power-On Self Test (POST): 1. Power on the PDUs (if used). 2. At the bottom rear of the director, set the power switch (circuit breaker) to the Up position. The director powers on. The following occurs during POST: ■ Amber LEDs on both CTP2 cards and all universal port module (UPM) cards illuminate momentarily. ■ The green LED on each CTP2 card (active and backup) turns ON as the card is tested and UPM cards are tested. ■ Green LEDs associated with Fibre Channel ports sequentially illuminate as the ports are tested. Director 2/64 Installation Guide 71

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148

Installing and Configuring the Director 2/64
71
Director 2/64 Installation Guide
Figure 29:
Recommended cable management
Power-On Self Test
Use the following steps to run a Power-On Self Test (POST):
1.
Power on the PDUs (if used).
2.
At the bottom rear of the director, set the power switch (circuit breaker) to the
Up position.
The director powers on. The following occurs during POST:
Amber LEDs on both CTP2 cards and all universal port module (UPM)
cards illuminate momentarily.
The green LED on each CTP2 card (active and backup) turns O
N
as the
card is tested and UPM cards are tested.
Green LEDs associated with Fibre Channel ports sequentially illuminate
as the ports are tested.