HP Surestore 64 FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide ( - Page 62

Prepare the Front and Rear Rack Columns, Preparing the front rack columns,

Page 62 highlights

Installing and Configuring the Director 2/64 Prepare the Front and Rear Rack Columns Use the following procedure to prepare the rack for installing a switch: 1. Prepare the front rack columns, as shown in Figure 20: a. Standing at the front of the rack, count up from the top of the rail tray (1) to the 13th, 19th, and 23rd holes on the rack's front face. b. Slide a sheet metal nut (2) on each of the located holes. Note: Three sheet metal nuts should be on each front column face (3). Figure 20: Preparing the front rack columns 2. Prepare the rear rack columns, as shown in Figure 21: a. Standing at the back of the rack, count up from the top of the rail tray (1) to 12th and 28th on the rack's back face. b. Slide a sheet metal nut (2) on each of the located holes. 62 Director 2/64 Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148

Installing and Configuring the Director 2/64
62
Director 2/64 Installation Guide
Prepare the Front and Rear Rack Columns
Use the following procedure to prepare the rack for installing a switch:
1.
Prepare the front rack columns, as shown in
Figure 20
:
a.
Standing at the front of the rack, count up from the top of the rail tray (
1
)
to the 13th, 19th, and 23rd holes on the rack's front face.
b.
Slide a sheet metal nut (
2
) on each of the located holes.
Note:
Three sheet metal nuts should be on each front column face (
3
).
Figure 20:
Preparing the front rack columns
2.
Prepare the rear rack columns, as shown in
Figure 21
:
a.
Standing at the back of the rack, count up from the top of the rail tray (
1
)
to 12th and 28th on the rack’s back face.
b.
Slide a sheet metal nut (
2
) on each of the located holes.