Dell PowerEdge MX750c EMC Installation and Service Manual - Page 24

Installing the sled into enclosure, Installing the I/O connector cover on sled

Page 24 highlights

Figure 12. Installing the I/O connector cover on sled NOTE: The color of the I/O connector cover may differ. CAUTION: If you are permanently removing the sled, install a sled blank promptly. Operating the enclosure without a blank, for an extended time can result in overheating or performance loss. Next steps 1. Install the sled. Installing the sled into enclosure Prerequisites 1. Follow the safety guidelines listed in Safety instructions. CAUTION: To prevent damage to the I/O connectors, do not touch the connectors or the connector pins. Steps 1. Remove the I/O connector cover from the I/O connector(s) and store for future use. CAUTION: To protect the I/O connector pins, install the I/O connector cover every time a sled is removed from the enclosure. 24 Installing and removing system components

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113

Figure 12. Installing the I/O connector cover on sled
NOTE:
The color of the I/O connector cover may differ.
CAUTION:
If you are permanently removing the sled, install a sled blank promptly. Operating the enclosure
without a blank, for an extended time can result in overheating or performance loss.
Next steps
1.
Install the sled
.
Installing the sled into enclosure
Prerequisites
1.
Follow the safety guidelines listed in
Safety instructions
.
CAUTION:
To prevent damage to the I/O connectors, do not touch the connectors or the connector pins.
Steps
1.
Remove the I/O connector cover from the I/O connector(s) and store for future use.
CAUTION:
To protect the I/O connector pins, install the I/O connector cover every time a sled is removed
from the enclosure.
24
Installing and removing system components