HP 6125XLG R2306-HP 6125XLG Blade Switch FCoE Configuration Guide - Page 89
Configuration considerations, Configuration procedure, Zone 3 consists of Server C and Disks B and C.
View all HP 6125XLG manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 89 highlights
Figure 23 Network diagram Server A FC_ID: 010001 Zone 1 Disk A PWWN: 11:22:33:44:55:66:77:88 (FC_ID:020006) Server B FC_ID: 010002 Server C FC_ID: 010003 Switch A Switch B Zone 2 Zone 3 Disk B PWWN: 22:33:44:55:66:77:88:99 (FC_ID:020005) Alias 1 Disk C FC_ID: 020004 Configuration considerations To meet the preceding requirements, divide VSAN 1 into three zones as follows: • Zone 1 consists of Server A. • Zone 2 consists of Server B and Disks A, B, and C. • Zone 3 consists of Server C and Disks B and C. Configure Switch A and distribute the full zone database to Switch B: • Create zone alias Alias 1, which consists of Disks B and C, to simplify the configuration. • Create zone set Zoneset 1, which consists of Zones 1, 2, and 3, and activate it. Configuration procedure Configure Switch A only. If the FCF switch is connected to a server or storage device with a CNA, you must also configure DCBX on the connecting Ethernet interface. For information about configuring DCBX, see Layer 2-LAN Switching Configuration Guide. For information about configuring physical-to-VFC interface bindings and VLAN-to-VSAN mappings, see "Configuring a VFC interface" and "Enabling FCoE for a VLAN and mapping a VSAN to the VLAN." # Configure Switch A to operate in advanced mode, save the configuration, and reboot Switch A. (Skip this step if the switch is operating in advanced mode.) system-view [SwitchA] system-working-mode advance Do you want to change the system working mode? [Y/N]:y The system working mode is changed, please save the configuration and reboot the system to make it effective. # Configure Switch A to operate in FCF mode. Enter the view of VSAN 1. system-view 83