Sharp MX 4501N Installation Manual - Page 11

Set the control level for the reference toner, density

Page 11 highlights

7) Install each developer unit. * When installing the developer unit, be sure to check that the DV lock lever is open. F. Set the control level for the reference toner density 1) Connect the earth cord and insert the power plug into the power outlet. 8) Fix it with the fixing screw. Insert the DV lock lever until it clicks and close. 2) Turn ON the power switch in the front cabinet. 2 ON 1 9) Close the drum positioning unit, and tighten the blue screw. 3) Turn ON the power switch on the operation panel. ON ON 10) Install the waste toner bottle unit (package part No. 1). 4) With the front cabinet open, enter the data for Simulation 25-2. TEST SIMULATION NO.25-02 AUTOMATIC DEVELOPER ADJUSTMENT AT DEVE ADJ_L_K : 128 AT DEVE VO_L_K : 128 AT DEVE ADJ_L_C : 128 AT DEVE VO_L_C : 128 AT DEVE ADJ_L_M : 128 AT DEVE ADJ_L_Y : 128 K C M Y AT DEVE VO_L_M : 128 AT DEVE VO_L_Y : 128 EXECUTE 0 CLOSE 1/2 MX-3500N/4500N, MX-3501N/4501N 1 - 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72

MX-3500N/4500N, MX-3501N/4501N
1 – 8
7)
Install each developer unit.
*
When installing the developer unit, be sure to check that the
DV lock lever is open.
8)
Fix it with the fixing screw. Insert the DV lock lever until it clicks
and close.
9)
Close the drum positioning unit, and tighten the blue screw.
10)
Install the waste toner bottle unit (package part No. 1).
F.
Set the control level for the reference toner
density
1)
Connect the earth cord and insert the power plug into the
power outlet.
2)
Turn ON the power switch in the front cabinet.
3)
Turn ON the power switch on the operation panel.
4)
With the front cabinet open, enter the data for Simulation 25-2.
1
2
ON
ON
ON
0
SIMULATION
NO.25-02
TEST
AUTOMATIC
DEVELOPER
ADJUSTMENT
EXECUTE
AT DEVE ADJ_L_K
128
:
AT DEVE VO_L_K
128
:
AT DEVE ADJ_L_C
128
:
AT DEVE VO_L_C
128
:
AT DEVE ADJ_L_M
128
:
AT DEVE VO_L_M
128
:
AT DEVE ADJ_L_Y
128
:
128
:
1/2
CLOSE
AT DEVE VO_L_Y
K
C
M
Y