Symantec 10490452 Administration Guide - Page 179

Scheduled Reports, Report Addresses

Page 179 highlights

Working with reports 179 Scheduling reports to be emailed 2 In the Control Center, click Reports > Scheduled Reports. 3 Click Add. 4 In the Report Name box, type a name for the report. 5 Using the procedure under "Running reports" on page 173 as a guide, select the desired report and report settings. 6 Under Report Schedule, set the time of day to generate the report using the Generate report at drop-down lists. 7 Under Report Schedule, specify the time intervals at which you want to generate the report. If you specify 29, 30, or 31 in the Day of every month box, and a month doesn't have one of those days, the report won't be sent. Choose the Last day of every month option to avoid this problem. 8 Under Report Format, click one of the following to specify the format: ■ HTML formats the report in HTML format. Check Chart, Table, or both. See "About charts and tables" on page 172. ■ CSV formats the report in comma-separated-values format Note: To view a CSV file containing double-byte characters in Microsoft Excel, specify a comma delimited, UTF-8 file in the MS Excel Text Import Wizard. 9 Under Report Addresses, type an email address, such as [email protected], in the Send from the following email address box. 10 Under Report Addresses, type at least one email address in the Send to the following email addresses box. You can use spaces, commas, or semi-colons as separators between email addresses. 11 Click Save. A report can also be scheduled by clicking the Schedule button on the View Reports page. To edit a scheduled report 1 In the Control Center, click Reports > Scheduled Reports. 2 Check the box next to the scheduled report that you want to edit, and then click Edit. You can also click the underlined report name to jump directly to the edit page for the report. 3 Make any changes to the settings.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258

179
Working with reports
Scheduling reports to be emailed
2
In the Control Center, click
Reports
>
Scheduled Reports
.
3
Click
Add
.
4
In the
Report Name
box, type a name for the report.
5
Using the procedure under
“Running reports”
on page 173 as a guide, select
the desired report and report settings.
6
Under Report Schedule, set the time of day to generate the report using the
Generate report at drop-down lists.
7
Under Report Schedule, specify the time intervals at which you want to
generate the report.
If you specify 29, 30, or 31 in the
Day of every month box
, and a month
doesn’t have one of those days, the report won’t be sent. Choose the
Last day
of every month
option to avoid this problem.
8
Under Report Format, click one of the following to specify the format:
HTML
formats the report in HTML format. Check
Chart
,
Table
, or both.
See
“About charts and tables”
on page 172.
CSV
formats the report in comma-separated-values format
Note:
To view a CSV file containing double-byte characters in Microsoft
Excel, specify a comma delimited, UTF-8 file in the MS Excel Text Import
Wizard.
9
Under
Report Addresses
, type an email address, such as
Send from the following email address
box.
10
Under
Report Addresses
, type at least one email address in the
Send to the
following email addresses
box.
You can use spaces, commas, or semi-colons as separators between email
addresses.
11
Click
Save
.
A report can also be scheduled by clicking the Schedule button on the View
Reports page.
To edit a scheduled report
1
In the Control Center, click
Reports
>
Scheduled Reports
.
2
Check the box next to the scheduled report that you want to edit, and then
click
Edit
. You can also click the underlined report name to jump directly to
the edit page for the report.
3
Make any changes to the settings.