Brother International Innov-is XJ2 Operation Manual - Page 131

Attaching The Embroidery, Frame

Page 131 highlights

ATTACHING THE EMBROIDERY FRAME ATTACHING THE EMBROIDERY FRAME Note • Wind embroidery bobbin thread and insert the bobbin before attaching the embroidery frame. Check that there is enough thread in the bobbin. • Make sure that the frame-securing lever is correctly lowered after the embroidery frame has been installed in the embroidery frame holder.  Removing the Embroidery Frame a Press presser (Presser foot. foot lifter button) to raise the b Raise the frame-securing lever. a Press (Presser foot lifter button) to raise the presser foot. b Align the embroidery frame guide of the embroidery frame holder. with the right edge c Pull the embroidery frame toward you. 4 BASIC EMBROIDERY 1 Embroidery frame holder 2 Embroidery frame guide c Slide the embroidery frame into the holder, making sure to align the embroidery frame's with the holder's . 1 Arrow mark d Lower the frame-securing lever to be level with frame to secure the embroidery frame in the the embroidery frame holder. 1 Frame-securing lever 129

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212

ATTACHING THE EMBROIDERY FRAME
129
BASIC EMBROIDERY
4
a
Press
(Presser foot lifter button) to raise the
presser foot.
b
Align the embroidery frame guide with the right edge
of the embroidery frame holder.
1
Embroidery frame holder
2
Embroidery frame guide
c
Slide the embroidery frame into the holder, making
sure to align the embroidery frame’s
with the
holder’s
.
1
Arrow mark
d
Lower the frame-securing lever to be level with the
frame to secure the embroidery frame in the
embroidery frame holder.
1
Frame-securing lever
Removing the Embroidery Frame
a
Press
(Presser foot lifter button) to raise the
presser foot.
b
Raise the frame-securing lever.
c
Pull the embroidery frame toward you.
ATTACHING THE EMBROIDERY
FRAME
Note
Wind embroidery bobbin thread and insert the
bobbin before attaching the embroidery frame.
Check that there is enough thread in the bobbin.
Make sure that the frame-securing lever is correctly
lowered after the embroidery frame has been
installed in the embroidery frame holder.