Epson R260 Service Manual - Page 100

Reinstalling the EJ Frame Assy

Page 100 highlights

EPSON Stylus Photo R260/R265/R270, R360/R380/R390 3. Disengage the connector cables of the PE Sensor and the APG Sensor from the two hooks (A). 4. Remove the two screws and remove the Cable Holder Frame from the two hooks (B). • Screw : C.B.S. M3x6 (tightening torque: 7-9 kgf.cm) (The numbers shown in the figure indicate the order of tightening the screws.) Cable Holder Frame 2 1 : Hook A : Hook B PE Sensor Cable APG Sensor Cable Figure 4-128. Removing the Cable Holder Frame 5. Remove the left and right screws, and remove the Front Frame. • Screw : C.B.S. M3x6 (tightening torque: 7-9 kgf.cm) (The numbers shown in the figure indicate the order of tightening the screws.) Removal Direction Front Frame 1 2 Figure 4-129. Removing the Front Frame 6. Remove the EJ Frame Assy. Revision B Removal Direction EJ Frame Assy Figure 4-130. Removing the EJ Frame Assy „ Lubrication is required. See the page given below for the lubrication information. "6.1.3 Lubrication (p.131)" „ When installing the EJ Frame Assy, insert its two lower bushings over the EJ Roller Shaft. EJ Frame Assy Bushing Bushing EJ Roller Shaft Figure 4-131. Reinstalling the EJ Frame Assy „ When installing the EJ Frame, make sure that the Left/Right EJ Frame Springs are attached as shown in the figure below. Carefully handle the EJ Frame as the springs come off easily. Shorter Left EJ Frame Spring Right EJ Frame Spring Figure 4-132. Reinstalling the Front Frame (1) Longer Disassembly/Assembly Disassembly of the Printer Mechanism 101

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150

EPSON Stylus Photo R260/R265/R270, R360/R380/R390
Revision B
Disassembly/Assembly
Disassembly of the Printer Mechanism
101
3.
Disengage the connector cables of the PE Sensor and the APG Sensor from
the two hooks (A).
4.
Remove the two screws and remove the Cable Holder Frame from the two
hooks (B).
Screw
: C.B.S. M3x6 (tightening torque: 7-9 kgf.cm)
(The numbers shown in the figure indicate the order of tightening the screws.)
Figure 4-128.
Removing the Cable Holder Frame
5.
Remove the left and right screws, and remove the Front Frame.
Screw
: C.B.S. M3x6 (tightening torque: 7-9 kgf.cm)
(The numbers shown in the figure indicate the order of tightening the screws.)
Figure 4-129.
Removing the Front Frame
6.
Remove the EJ Frame Assy.
Figure 4-130.
Removing the EJ Frame Assy
PE Sensor Cable
APG Sensor Cable
Cable Holder Frame
1
2
: Hook A
: Hook B
Removal Direction
1
2
Front Frame
Lubrication is required. See the page given below for the
lubrication information.
"6.1.3 Lubrication (p.131)"
When installing the EJ Frame Assy, insert its two lower
bushings over the EJ Roller Shaft.
Figure 4-131.
Reinstalling the EJ Frame Assy
When installing the EJ Frame, make sure that the Left/Right EJ
Frame Springs are attached as shown in the figure below.
Carefully handle the EJ Frame as the springs come off easily.
Figure 4-132.
Reinstalling the Front Frame (1)
EJ Frame Assy
Removal Direction
Bushing
Bushing
EJ Roller Shaft
EJ Frame Assy
Left EJ Frame Spring
Right EJ Frame Spring
Shorter
Longer