Epson R260 Service Manual - Page 131

EPSON Stylus Photo R260/R265/R270, R360/R380/R390, Revision B, Maintenance, Overview

Page 131 highlights

EPSON Stylus Photo R260/R265/R270, R360/R380/R390 Revision B LUBRICATION OF FRONT PAPER GUIDE ASSY Front Paper Guide Assy (left) PF Roller Shaft, EJ Roller Shaft and Bushing (3 points) G-71 ø 1 x 3 mm x 3 points Apply after installing the Front Paper guide Application Point Apply with Injector † Make sure that the coated part of the PF Roller Shaft and rubber rollers on the EJ Roller are free from grease. Figure 6-4. Lubrication of Front Paper Guide Assy (1) Front Paper Guide Assy (right) PF Roller Shaft, EJ Roller Shaft and Bushing (2 points) G-71 ø 1 x 3 mm x 2 points Application Point Application Point Apply after installing the Front Paper guide Apply with Injector † Make sure that the coated part of the PF Roller Shaft and rubber rollers on the EJ Roller are free from grease. Figure 6-5. Lubrication of Front Paper Guide Assy (2) LUBRICATION OF EJ FRAME ASSY EJ Frame Assy Bushing EJ Frame Assy Busing (Left/Right back side) G-71 Left Right ø1 x 1mm x 2 points (Right busing, both inner sides) ø1 x 3mm x 2 points (Left busing, both inner sides) Apply before installing the EJ Frame Application Point Apply with Injector † Apply to the both inner sides of the left/right bushings. Figure 6-6. Lubrication of EJ Frame Assy Front Frame contact point (left) Contact point between the Front Frame and the PE Frame Assy (2 points) Rib G-71 ø1 x 7mm (Left rib) ø1 x 3mm (Left notch for spring) Notch for spring Application Point Apply before installing the Front Frame Apply with Injector † Apply to the inner edge of the notch for spring. Figure 6-7. Lubrication of the Front Frame (1) Maintenance Overview 132

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150

EPSON Stylus Photo R260/R265/R270, R360/R380/R390
Revision B
Maintenance
Overview
132
LUBRICATION OF FRONT PAPER GUIDE ASSY
Figure 6-4.
Lubrication of Front Paper Guide Assy (1)
Figure 6-5.
Lubrication of Front Paper Guide Assy (2)
LUBRICATION OF EJ FRAME ASSY
Figure 6-6.
Lubrication of EJ Frame Assy
Figure 6-7.
Lubrication of the Front Frame (1)
<Lubrication Points>
PF Roller Shaft, EJ Roller Shaft and
Bushing (3 points)
<Type>
G-71
<Application Amount>
ø 1 x 3 mm x 3 points
<Application Timing>
Apply after installing the Front Paper
guide
<Remarks>
Apply with Injector
Make sure that the coated part of the
PF Roller Shaft and rubber rollers on
the EJ Roller are free from grease.
<Lubrication Points>
PF Roller Shaft, EJ Roller Shaft and
Bushing (2 points)
<Type>
G-71
<Application Amount>
ø 1 x 3 mm x 2 points
<Application Timing>
Apply after installing the Front Paper
guide
<Remarks>
Apply with Injector
Make sure that the coated part of the
PF Roller Shaft and rubber rollers on
the EJ Roller are free from grease.
Front Paper Guide Assy (left)
Application Point
Application Point
Front Paper Guide Assy (right)
Application Point
<Lubrication Points>
EJ Frame Assy Busing
(Left/Right back side)
<Type>
G-71
<Application Amount>
ø1 x 1mm x 2 points
(Right busing, both inner sides)
ø1 x 3mm x 2 points
(Left busing, both inner sides)
<Application Timing>
Apply before installing the EJ Frame
<Remarks>
Apply with Injector
Apply to the both inner sides of the
left/right bushings.
<Lubrication Points>
Contact point between the Front Frame
and the PE Frame Assy
(2 points)
<Type>
G-71
<Application Amount>
ø1 x 7mm (Left rib)
ø1 x 3mm (Left notch for spring)
<Application Timing>
Apply before installing the Front Frame
<Remarks>
Apply with Injector
Apply to the inner edge of the notch
for spring.
Left
Right
EJ Frame Assy Bushing
Application Point
Notch for spring
Front Frame contact point (left)
Rib
Application Point