Epson R260 Service Manual - Page 58

Work Completion Checklist - ink pad

Page 58 highlights

EPSON Stylus Photo R260/R265/R270, R360/R380/R390 4.1.4 Work Completion Checklist Whenever the printer is serviced, use the checklist shown below to confirm all work is completed properly and the printer is ready to be returned to the user. Make sure to always check the maintenance counter before disassembling the printer. If the counter shows that some part or component has almost reached the end of its service life, replace the part after receiving prior approval from the user. Table 4-4. Work Completion Checklist Classification Item Printer Unit Self-test On-line Test Check Point Is the operation normal? Is the printing attempt successful? Status †OK / †NG †OK / †NG Printhead (print a nozzle check pattern) Carriage Mechanism Paper Feeding Mechanism On-line Test On-line Test Is ink discharged normally from all the nozzles? †OK / †NG Does the carriage move smoothly? Is there any abnormal noise during its operation? Is paper advanced smoothly? No paper jamming? No paper skew? No multiple-sheet feeding? No abnormal noise? Is the paper path free of obstructions? Is the operation normal? †OK / †NG †OK / †NG †OK / †NG †OK / †NG †OK / †NG †OK / †NG †OK / †NG †OK / †NG †OK / †NG Adjustment Specified Adjustments Are all the adjustments correctly completed? †OK / †NG Lubrication Specified Lubrication Has lubrication been applied at the specified points? Is the amount of lubrication correct? †OK / †NG †OK / †NG Function Firmware Version Version: †OK / †NG Revision B Table 4-4. Work Completion Checklist Classification Item Check Point Status Packing Ink Cartridge Are the ink cartridges installed correctly? †OK / †NG Waste Ink Pads Is the remaining capacity of the waste ink pads enough? †OK / †NG Carriage position Is the carriage located at the position where the Printhead is covered with the †OK / †NG cap? Protection (strong tape, vinyl sheet) Have the specified parts been secured with the strong tapes to prevent damage during transportation? See Protection for transportation (p.60) †OK / †NG Others Attachments, Accessories Have all the relevant items been included in/returned to the package? †OK / †NG Disassembly/Assembly Overview 59

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150

EPSON Stylus Photo R260/R265/R270, R360/R380/R390
Revision B
Disassembly/Assembly
Overview
59
4.1.4
Work Completion Checklist
Whenever the printer is serviced, use the checklist shown below to confirm all work is
completed properly and the printer is ready to be returned to the user.
Make sure to always check the maintenance counter before disassembling the printer.
If the counter shows that some part or component has almost reached the end of its
service life, replace the part after receiving prior approval from the user.
Table 4-4.
Work Completion Checklist
Classification
Item
Check Point
Status
Printer
Unit
Self-test
Is the operation normal?
OK /
NG
On-line Test
Is the printing attempt successful?
OK /
NG
Printhead
(print a nozzle
check pattern)
Is ink discharged normally from all the
nozzles?
OK /
NG
Carriage
Mechanism
Does the carriage move smoothly?
OK /
NG
Is there any abnormal noise during its
operation?
OK /
NG
Paper Feeding
Mechanism
Is paper advanced smoothly?
OK /
NG
No paper jamming?
OK /
NG
No paper skew?
OK /
NG
No multiple-sheet feeding?
OK /
NG
No abnormal noise?
OK /
NG
Is the paper path free of obstructions?
OK /
NG
On-line Test
On-line Test
Is the operation normal?
OK /
NG
Adjustment
Specified
Adjustments
Are all the adjustments correctly
completed?
OK /
NG
Lubrication
Specified
Lubrication
Has lubrication been applied at the
specified points?
OK /
NG
Is the amount of lubrication correct?
OK /
NG
Function
Firmware
Version
Version:
OK /
NG
Packing
Ink
Cartridge
Are the ink cartridges installed
correctly?
OK /
NG
Waste Ink Pads
Is the remaining capacity of the waste
ink pads enough?
OK /
NG
Carriage position
Is the carriage located at the position
where the Printhead is covered with the
cap?
OK /
NG
Protection (strong
tape, vinyl sheet)
Have
the specified parts been secured
with the strong tapes to prevent
damage during transportation?
See
Protection for transportation (p.60)
OK /
NG
Others
Attachments,
Accessories
Have all the relevant items been
included in/returned to the package?
OK /
NG
Table 4-4.
Work Completion Checklist
Classification
Item
Check Point
Status