Epson R260 Service Manual - Page 133

LUBRICATION OF INK SYSTEM, LUBRICATION OF APG UNIT, Lubrication of the CR Shaft 1

Page 133 highlights

EPSON Stylus Photo R260/R265/R270, R360/R380/R390 Revision B Contact point between CR Unit and CR Shaft (1) CR Shaft Contact point between CR Unit and the CR Shaft G-71 210 ± 20mg x 2 points Apply before installing the CR Unit Application Point Apply with Injector † After lubrication, move the CR Shaft to left and right by 60mm while rotating it, to spread the grease evenly. † Make sure that the Timing Belt is free from grease. Figure 6-12. Lubrication of the CR Shaft (1) Contact point between CR Unit and CR Shaft (2) CR Shaft Application Point: Apply from the holes Lubrication holes of the Carriage Unit G-71 210 ± 20mg x 2 points Apply before installing the CR Unit Apply with Injector † Apply grease from the two lubrication holes. † Make sure that the Timing Belt is free from grease. Figure 6-13. Lubrication of the CR Shaft (2) LUBRICATION OF INK SYSTEM Contact point between Main Frame and I/S Application Point On the Main Frame where the clutch gear and spring of the Ink System contact G-71 ø 1 x 1 circle Apply before installing the Ink System Apply with Injector Figure 6-14. Lubrication of the I/S LUBRICATION OF APG UNIT Dowels on APF Unit Dowel Application Point Application Point Around the upper part of the dowels on the APG Unit. (5 points) G-71 ø 1 x 1 circle x 5 points Disassemble the APG Unit to apply the grease before installing it. Apply with Injector Figure 6-15. Lubrication of the APG Unit (1) Maintenance Overview 134

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150

EPSON Stylus Photo R260/R265/R270, R360/R380/R390
Revision B
Maintenance
Overview
134
Figure 6-12.
Lubrication of the CR Shaft (1)
Figure 6-13.
Lubrication of the CR Shaft (2)
LUBRICATION OF INK SYSTEM
Figure 6-14.
Lubrication of the I/S
LUBRICATION OF APG UNIT
Figure 6-15.
Lubrication of the APG Unit (1)
<Lubrication Points>
Contact point between CR Unit and the
CR Shaft
<Type>
G-71
<Application Amount>
210 ± 20mg x 2 points
<Application Timing>
Apply before installing the
CR Unit
<Remarks>
Apply with Injector
After lubrication, move the CR Shaft
to left and right by 60mm while
rotating it, to spread the grease
evenly.
Make sure that the Timing Belt is
free from grease.
<Lubrication Points>
Lubrication holes of the Carriage Unit
<Type>
G-71
<Application Amount>
210 ± 20mg x 2 points
<Application Timing>
Apply before installing the
CR Unit
<Remarks>
Apply with Injector
Apply grease from the two
lubrication holes.
Make sure that the Timing Belt is
free from grease.
Contact point between
CR Unit and CR Shaft (1)
CR Shaft
Application Point
CR Shaft
Contact point between CR
Unit and CR Shaft (2)
Application Point: Apply from the holes
<Lubrication Points>
On the Main Frame where the clutch
gear and spring of the Ink System
contact
<Type>
G-71
<Application Amount>
ø 1 x 1 circle
<Application Timing>
Apply before installing the
Ink System
<Remarks>
Apply with Injector
<Lubrication Points>
Around the upper part of the dowels on
the APG Unit. (5 points)
<Type>
G-71
<Application Amount>
ø 1 x 1 circle x 5 points
<Application Timing>
Disassemble the APG Unit to apply the
grease before installing it.
<Remarks>
Apply with Injector
Contact point between
Main Frame and I/S
Application Point
Dowel
Application Point
Application
Point
Dowels on APF Unit