Epson R260 Service Manual - Page 99

EJ Frame Assy, Wrap the CR Motor Cable together with the PE Sensor Cable

Page 99 highlights

EPSON Stylus Photo R260/R265/R270, R360/R380/R390 „ Lubrication is required. See the page given below for the lubrication information. "6.1.3 Lubrication (p.131)" „ When installing the CR Motor, install it so that the print side faces upwards. Figure 4-125. Reinstalling the CR Motor „ Tighten the screws in the order given in Fig.4-124. „ When installing the Timing Belt, make sure that it is not twisted and the lumpy side faces inward. „ Routing of the CR Motor/PE Sensor cables Route the cables as described below referring to the Fig.4-123. 1. Wrap the CR Motor Cable together with the PE Sensor Cable with the 20mm-length acetate tape at the (1) position. 2. Align the center of the taped portion with the center of the hook (1), then wrap the cables at another two positions each with 20 mm-length acetate tape so that the center of the each taped portion comes to the center of hook (2) and (3) respectively. 3. Secure the taped cables with the (1) (2) (3) hooks so that the PE Sensor Cable faces inward. „ Route the PE Sensor Cable on the left side of the printer referring to the page below. "Routing of the APG and PE Sensor Cables." (p.102) „ Route the PF Motor cables on the left side of the printer referring to the page below. "Routing of the PF Motor cables" (p.103) A D JU S TM E N T R E Q U IR E D Whenever the CR Motor is replaced, the required adjustments must be carried out. See "Table 5-4. Adjustment Items (p.116)" in Chapter 5 Revision B 4.5.9 EJ Frame Assy C A U T IO N Take extra care to avoid injury from sharp metal edges. Before starting, see the page given below to check the dangerous edges. •"4.1.8 Sharp Metal Edges (Danger!)" (p.62) † Parts/Components need to be removed in advance All exterior parts/ All control boards / Middle Housing / Printer Mechanism / CR Scale / APG Unit † Removal procedure CHECK P O IN T Refer to the Orientation Definition below for the directions indicated in the following procedures. •"4.1.6 Orientation Definition (p.61)" 1. Move the CR Unit to the HP side. CR Unit Figure 4-126. Moving the CR Unit 2. Peel off the acetate tape, and disengage the Head FFC from the hook, peel off the two double-sided tapes and remove the Head FFC from the Front Frame. [Rear side] Hook Head FFC Double-sided tape Acetate Tape Position Figure 4-127. Removing the Head FFC Disassembly/Assembly Disassembly of the Printer Mechanism 100

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150

EPSON Stylus Photo R260/R265/R270, R360/R380/R390
Revision B
Disassembly/Assembly
Disassembly of the Printer Mechanism
100
4.5.9
EJ Frame Assy
Parts/Components need to be removed in advance
All exterior parts/ All control boards / Middle Housing / Printer Mechanism / CR Scale
/ APG Unit
Removal procedure
1.
Move the CR Unit to the HP side.
Figure 4-126.
Moving the CR Unit
2.
Peel off the acetate tape, and disengage the Head FFC from the hook, peel off
the two double-sided tapes and remove the Head FFC from the Front Frame.
Figure 4-127.
Removing the Head FFC
Lubrication is required. See the page given below for the
lubrication information.
"6.1.3 Lubrication (p.131)"
When installing the CR Motor, install it so that the print side
faces upwards.
Figure 4-125.
Reinstalling the CR Motor
Tighten the screws in the order given in
Fig.4-124
.
When installing the Timing Belt, make sure that it is not
twisted and the lumpy side faces inward.
Routing of the CR Motor/PE Sensor cables
Route the cables as described below referring to the
Fig.4-123
.
1. Wrap the CR Motor Cable together with the PE Sensor Cable
with the 20mm-length acetate tape at the (1) position.
2. Align the center of the taped portion with the center of the
hook (1), then wrap the cables at another two positions each
with 20 mm-length acetate tape so that the center of the each
taped portion comes to the center of hook (2) and (3)
respectively.
3.
Secure the taped cables with the (1) (2) (3) hooks so that the PE
Sensor Cable faces inward.
Route the PE Sensor Cable on the left side of the printer
referring to the page below.
“Routing of the APG and PE Sensor Cables.” (p.102)
Route the PF Motor cables on the left side of the printer
referring to the page below.
“Routing of the PF Motor cables” (p.103)
A
D
J
U
S
T
M
E
N
T
R
E
Q
U
I
R
E
D
Whenever the CR Motor is replaced, the required adjustments
must be carried out.
See “Table 5-4. Adjustment Items (p.116)” in Chapter 5
C
A
U
T
I
O
N
Take extra care to avoid injury from sharp metal edges. Before
starting, see the page given below to check the dangerous edges.
“4.1.8 Sharp Metal Edges (Danger!)” (p.62)
C
H
E
C
K
P
O
I
N
T
Refer to the Orientation Definition below for the directions
indicated in the following procedures.
“4.1.6 Orientation Definition (p.61)”
CR Unit
Double-sided tape
Head FFC
Acetate Tape Position
Hook
[Rear side]